30 ChatGPT Prompts for Home Renovation Scope, Quotes and Timelines

30 copy-paste prompts

Paste your notes, quotes and punch lists. Get scope tables, contractor questions and trackers back. Check codes, permits, loan terms and taxes locally. This is not legal or financial advice.

In short: This page contains 30 copy-paste ready prompts, organized into 6 categories with a description and pro tip for each. The first 5 prompts are free instantly, no signup needed. Drafted with AI writing assistance and checked against our editorial policy.

Louis Corneloup
By Louis Corneloup · Founder, Techpresso
Last updated ·Drafted with AI assistance (how we make prompts)

Scope and Sequencing

5 prompts

Keep Versus Demo Table

1/30

✨ What it does

Produces a keep-versus-demo table of up to eight rows plus a 60-word demo order. Walk the room with the table and mark any wall your inspector still has to call.

Build a keep-versus-demo table for [ROOM NAME] from my notes only: [ROOM NOTES]. Output a table with up to 8 rows, one per item I wrote; stop when my notes run out. Columns: Item, Keep or demo, Why from my notes, Photo I already took. Then add a 60-word sequence note for what comes off the walls first. Anything I did not tell you about hidden damage, asbestos, lead paint, load-bearing walls or code stays as [VERIFY]; I would rather chase a blank than correct an invention. Point me to my inspector or the local building department for those blanks.

💡

Pro tip: Photograph every cabinet interior and its serial plate before you label it demo, so you can match a door if one is later backordered.

Kitchen Five Questions First

2/30

✨ What it does

Asks five questions first, then returns a 120-word kitchen scope and five missing-fact bullets. Call your city on any line tagged for a permit or setback.

Ask me exactly 5 questions, one at a time, then wait for each answer. Context I already wrote: [KITCHEN NOTES]. Ask about: how we cook on a weeknight, which appliance we refuse to lose, the wall we think hides plumbing, whether we eat in the room, and any city or HOA rule I already know. After all five answers, write a 120-word working-kitchen scope plus 5 bullets of facts still missing. Before the bullets, list any appliance model, hookup, vent run or permit rule you could not fill and why. Mark each of those [VERIFY] for my local building department; never invent a model number or a city rule to complete the list.

💡

Pro tip: Write the one appliance you will not give up. That choice drives the wall you keep.

Three Bathroom Remodel Paths

3/30

✨ What it does

Gives three bathroom paths in a table, then picks one in 80 words from your notes. Confirm wet-area rules with your city before you tear out the pan.

Here is my dated bathroom: [BATHROOM NOTES]. Constraints from my notes: [BUDGET RANGE FROM MY NOTES], [MUST KEEP ITEMS], [MUST CHANGE ITEMS]. Give 3 remodel options as a table with columns Path, What changes, What stays, Time I estimated, Risk I named. Then pick one path in 80 words and say why it fits these notes. Keep each table cell under 10 words and the whole answer under 250 words. Do not invent fixture prices, a waterproofing method my city requires, or a permit trigger. If a cost or a wet-area rule is missing, write [VERIFY] instead of guessing a city rule. If my notes give no time or risk for an option, write [VERIFY] in that cell.

💡

Pro tip: List the toilet flange location if you know it. Ask your plumber how a drain move would affect the calendar.

Six Week Trade Sequence

4/30

✨ What it does

Builds six weekly trade blocks of 40 words plus a one-row-per-week dependency table. Write in real delivery dates from the supplier, not from memory of the last job.

Plan a 6-week trade sequence for [PROJECT NAME] from my notes: [TRADE NOTES], [LEAD TIMES I WAS TOLD], [HOUSE CONSTRAINTS]. Output 6 weekly blocks, each with 40 words covering who is in the house, what must be dry, and what I still buy. Then a table with one row per week, columns Week, Trade, Depends on, Homeowner buy, Open question. Lead times, inspection days and hold points come only from my notes. Before the table, list what you could not fill and why, each tagged [VERIFY] so I can confirm with that trade and the local inspector. Inventing a date here would wreck the sequence.

💡

Pro tip: Put millwork and windows on the table first. Ask each trade whether those lead times block the drywall close-in.

DIY Versus Hire Rewrite

5/30

✨ What it does

Scores your DIY split on safety, tools and hours, then rewrites it as eight grouped bullets. Ask your building department before you keep a structural task on the I-do list.

Read my DIY versus hire split: [DIY HIRE DRAFT]. Project: [PROJECT NOTES]. Score the draft out of 10 on three lines: safety I described, tools I already own, and hours I said I have. Then rewrite it as 8 bullets grouped into I do, they do, and still undecided. Flag any license, permit or structural call I did not confirm as [VERIFY]. Do not invent which tasks need a licensed trade in my city. Leave any trade I did not name as licensed as [VERIFY] for a local clerk.

💡

Pro tip: List tools already in the garage, not ones you would buy. Borrowed tools slip off the calendar.

Contractor Conversations

5 prompts

GC Visit Question Script

6/30

✨ What it does

Produces a 12-question contractor visit script plus an 80-word debrief sheet. Photograph the license and insurance card yourself before you treat a blank as answered.

Write me a question script for a general contractor visit. Project notes: [PROJECT NOTES]. Questions I already want asked: [MY QUESTIONS]. Make it 12 questions, each under 20 words, grouped into license and insurance I must see, scope I described, and site habits. Then add an 80-word debrief sheet with blanks for answers. Do not invent license numbers, insurance limits, or what my city requires on the card. Leave answer blanks for license and insurance numbers; never fill them in. If a city card rule is missing from my notes, write [VERIFY] and tell me to read the card in my hand.

💡

Pro tip: Ask where the crew parks and where the dumpster sits. Site habits show up before the first invoice does.

Bid Walk Six Steps

7/30

✨ What it does

Returns a 6-step bid walk plus a 50-word follow-up draft. Measure the openings yourself and paste those numbers before anyone prices the job.

I need a numbered 6-step walkthrough I can take on a bid visit at [ADDRESS OR AREA]. What bidders will see: [SITE NOTES]. Trades invited: [TRADE LIST]. Keep each step under 25 words. Cover: start at the main panel, look at every wet wall I named and note any access panel, measure the openings I listed, photograph existing finishes, confirm the dumpster spot I proposed, and close with a written question list. Output the 6 steps plus a 50-word follow-up email draft I can copy. Do not invent square footage, hidden rot, or bid totals. Missing measurements stay [VERIFY].

💡

Pro tip: Start at the main panel and note spare breaker spaces so you can ask bidders how a kitchen load would fit.

Two Bid Comparison Sheet

8/30

✨ What it does

Fills a seven-row bid sheet from two quotes you paste. If a cell is blank, go back to the PDF rather than filling it from memory.

Fill this bid comparison template from quotes I paste, nothing else. Quotes: [QUOTE A TEXT], [QUOTE B TEXT]. Template fields in this order: Scope in writing, Exclusions they named, Allowance items, Lead times, Payment stages they wrote, Warranty they wrote, Open questions. Output one filled table with 7 rows and columns Field, Quote A, Quote B, Same or different. Blank fields stay [VERIFY]. I would rather chase a blank than correct an invented number, date or promise. Copy only amounts I pasted. This is organisation, not financial advice.

💡

Pro tip: Paste exclusions in full, then ask the bidder to confirm each allowance line in writing.

Co-Owner Contractor Email

9/30

✨ What it does

Rewrites your contractor email into 120 words plus five asks a co-owner can track. Check every date against the last written message before you send it.

Rewrite this contractor email so a cautious co-owner can follow it. Original: [EMAIL DRAFT]. Facts they must keep: [FACTS TO KEEP]. Audience: [CO OWNER NOTES]. Output a 120-word email with a 5-bullet ask list under it. Keep every date, name and figure I supplied. Anything I did not tell you about a discount, start date or permit status stays as [VERIFY]; smoothing a gap is worse than leaving it blank. Never invent a figure to make the email feel complete.

💡

Pro tip: Put the decision you still need in the first sentence. Buried asks get skipped on a phone screen.

Lowest Bid Clarification Email

10/30

✨ What it does

Drafts a 120-word clarification email and an eight-line answer log from one quote and the gaps you found. Tick each log line only after the bidder replies in writing.

Read my quote and the gaps I already found. Quote: [QUOTE TEXT]. Gaps: [GAPS I FOUND]. Name on the bid: [CONTRACTOR NAME AS WRITTEN]. Draft a 120-word email that asks the bidder to confirm each gap in writing, one short paragraph plus a numbered ask list. Then add an 8-line checklist of answers I should log when they reply, each line under 12 words. Copy every figure from my paste. Do not invent unit prices, exclusions, or a start date they never wrote. If a gap I listed has no matching line in the quote, write [VERIFY] on that checklist line so I chase it. This email is organisation only, not a contract and not legal advice.

💡

Pro tip: Paste the gaps as a numbered list. Numbered gaps become numbered asks in the email.

Budget and Timeline

5 prompts

Budget Tracker From My Line Items

11/30

✨ What it does

Builds a budget tracker of up to ten rows plus five unpriced lines from your own figures. Fill tax and permit blanks from the city or your lender, not from a guess.

Build a budget tracker from the line items I already have: [LINE ITEMS WITH AMOUNTS]. Project: [PROJECT NAME]. Use up to 10 rows, one per line I wrote; stop when my notes run out. Columns: Line, Amount I pasted, Paid so far as I wrote, Still open, Source of the number. Then 5 bullets of lines I mentioned in notes but did not price, each tagged [VERIFY]. Do not invent amounts, tax rates, or lender rules. If I omitted sales tax or a permit fee, leave it [VERIFY] for me to ask my city or my lender.

💡

Pro tip: Put dumpster, portable toilet and meals on the list if you will pay them. Ask yourself how those costs look when the kitchen is out.

Papers Before the Lender

12/30

✨ What it does

Returns a ten-item document checklist and a 60-word question script before a lender talk. Confirm every term with that lender, since nothing here is a loan offer.

Act as a paperwork organiser, not a lender. Documents I already gathered: [DOCUMENTS I HAVE]. Project: [PROJECT NOTES]. Output a checklist of 10 items I should confirm I hold before I talk to [LENDER OR BROKER NAME], each item one line. Then a 60-word script of questions I can read, using only facts I supplied. Do not invent loan terms, rates, draw rules or tax treatment. Tag any missing appraisal, title or permit paper as [VERIFY]. I will confirm terms with the lender. This is not financial advice.

💡

Pro tip: Bring the signed scope, not a mood board. Ask the lender which papers they want to see with a draw request.

Kitchen Demo Slip Diagnosis

13/30

✨ What it does

Gives up to six possible slip causes, labelled from your notes or as questions, plus one table row per cause. Call the inspector yourself if a hold is still unconfirmed.

My kitchen demo is slipping. Symptoms: [SLIP SYMPTOMS]. Original plan I wrote: [ORIGINAL PLAN]. Trades waiting: [TRADE LIST]. Give up to 6 possible causes, each labelled 'in my notes' or 'ask about it', each under 20 words. Never state an unlisted cause as fact; phrase it as a question to ask. Then a table with one row per cause, columns Cause, What to ask whom, What I still need. Do not invent a supplier delay, an inspection fail, or a permit hold I did not describe. If a date or a city stop-work is missing, write [VERIFY]. I decide what to say to the crew.

💡

Pro tip: Paste the last text from the cabinet shop. A finish date in a chat is not a delivery date on a dock.

Three Live-In Phasing Paths

14/30

✨ What it does

Offers three live-in phasing paths in a table, then picks one in 70 words from your dates and amounts. Check any blank week count against the trade calendars you already have.

Give 3 phasing options for [PROJECT NAME] so we can live in the house. Constraints from my notes: [CASH TIMING NOTES], [ROOMS WE MUST KEEP LIVABLE], [HARD DATES]. Table columns: Option, Rooms in play, Weeks I estimated, Cash timing from my notes, Risk I named. Then pick one in 70 words. Do not invent loan draws, tax refunds, or contractor amounts. If a week count or an amount is not in my notes, write [VERIFY] rather than filling a calendar I never gave. If my notes give no risk for an option, write [VERIFY] in that cell.

💡

Pro tip: Keep the bathroom you will not lose on the livable list. A house with one working shower can wait on a pretty kitchen.

Payment Stage Check

15/30

✨ What it does

Builds a payment-stage table from the stages and progress notes you paste, plus five questions before the next payment. Write in any amount still tagged as missing from the contract, not from memory.

Here are the contract payment stages and my progress notes. Stages as written: [PAYMENT STAGES]. Progress: [PROGRESS NOTES]. Output a table with columns Stage, Work I say is done, Amount I was told, Paid, Open. Use one row per stage I listed and stop when the list ends. Then add 5 questions to ask before the next payment, each under 18 words. Copy every amount from my paste. Do not invent a draw amount, retainage figure, or a lien rule. If a stage has no amount in my notes, write [VERIFY] in that cell rather than filling it. This is a tracker, not financial advice.

💡

Pro tip: Paste the stage names exactly as the contract prints them, so a skipped draw is easier to spot than with nicknames.

Like these prompts? There are full tutorials behind them.

Learn the workflows, not just the prompts. Easy-to-follow tutorials inside AI Academy, and the library keeps growing.

Try AI Academy Free

Permits, Neighbors and Records

5 prompts

Permit Packet Checklist

16/30

✨ What it does

Produces a ten-item permit packet list and five things to bring to the counter from papers you already hold. Ask the local building department which forms they actually want.

Here is my city and project: [CITY AND PROJECT]. Papers I already hold: [PAPERS I HAVE]. Drawings I can bring later: [DRAWING NOTES]. Output a 10-item permit packet checklist, one line each, only for papers a homeowner typically gathers. Then 5 things to bring to the counter, under 15 words each. Before the checklist, list form names, setbacks, fees or exemption calls you could not fill, each as [VERIFY] for the local building department. Do not invent a permit-exempt path or an inspection sequence. This checklist is not legal advice.

💡

Pro tip: Bring a floor plan with the walls you will open marked in pencil. Ask the clerk what they want to see first.

Five Questions Before Permits

17/30

✨ What it does

Interviews you in five turns, then writes a 100-word permit call script with four clerk blanks. Fill those blanks from the person who answers the city phone.

Ask me exactly 5 questions, one at a time, then wait. I am about to call [BUILDING DEPARTMENT NAME]. What I already know: [WHAT I KNOW]. Ask about: the work description in my words, whether a wall might be load-bearing, who draws the plan, whether I already have a contractor of record, and any HOA rule I was told. After answers, write a 100-word call script plus 4 blanks labelled [VERIFY] for answers the clerk must give. Do not invent permit triggers, fees, or code sections, and do not treat the call script as legal advice.

💡

Pro tip: Describe the work by wall and opening, then ask the clerk what they need.

Neighbor Disruption Note

18/30

✨ What it does

Fills a 120-word neighbor note and a 40-word door hanger from dates and disruptions you supply. Confirm dumpster and parking rules with the city before you print them.

I need a 120-word neighbor note about [WORK TYPE] at [ADDRESS OR BLOCK]. Dates I can share: [DATES]. Disruptions I expect: [NOISE DUST PARKING]. Tone: [TONE]. How to reach me: [MY PHONE OR EMAIL]. Fill this template: greeting, what is happening, which days are loud, where trucks park, how to reach me. Use only the contact I give. Output the filled note, 120 words, plus a 40-word door-hanger version. Do not invent dumpster permits, street-occupancy rules, or HOA quiet hours. If a city parking or dumpster rule is missing, mark it [VERIFY] for me to check with the city, not this chat.

💡

Pro tip: Give a number you will answer in the morning, then ask the city how to post dumpster and parking notices.

HOA Exterior Request Rewrite

19/30

✨ What it does

Rewrites your HOA request as a 150-word letter plus a spec list of up to six bullets. Match color codes to the chip in your hand before you attach photos.

Rewrite this HOA architectural request so a reviewer who has not seen the house can follow it. Draft: [HOA DRAFT]. Facts to keep: [EXTERIOR FACTS]. Photos I will attach myself: [PHOTO LIST]. Output a 150-word letter plus a spec list of up to 6 bullets, one per item I gave, covering material, color name, sheen and location. Do not invent covenant rules, approval timelines, or product specs I did not type. Missing color codes or covenant clause numbers stay [VERIFY]. I will file what the HOA actually requires.

💡

Pro tip: Name the elevation the street sees. Ask the HOA whether they want front, side or rear called out.

Eight Photos Before Demo

20/30

✨ What it does

Lists eight pre-demo inspector photo steps and a one-row-per-step file log. Take the shots in that order so a missing serial plate is obvious before the dumpster arrives.

Number 8 photo steps I should take before demo in [ROOM NAME] so an inspector or a later dispute can see what was there. What is there now: [EXISTING CONDITIONS]. Why I need them: [INSPECTOR OR DISPUTE REASON]. Each step under 20 words, covering corners, ceiling stains, serial plates, tile lot stickers, the wall I think hides plumbing, and any permit notice already on site. Then a table with one row per photo step: Shot, Where, File name pattern, What it proves from my notes. Do not invent what an inspector will demand. If a plate or a stain location is missing, write [VERIFY] rather than guessing the number. Codes and permit photos stay a local call.

💡

Pro tip: Shoot the tile lot sticker in place, then again in your hand, before anyone starts demo.

Living Through Work

5 prompts

Temporary Kitchen Corner Plan

21/30

✨ What it does

Builds an eight-bullet temp kitchen, a six-row tool table and a 60-word seven-day hot meal list. Have a licensed electrician confirm any circuit you are unsure about.

You are my temporary kitchen planner. Household: [HOUSEHOLD NOTES]. Gear I already own: [TEMP GEAR]. Water and power I still have: [UTILITIES STILL ON]. Write a one-page plan: 8 bullets for a working corner, a 6-row table with columns Task, Tool I own, Where it lives, and a 60-word list for 7 days of hot meals. Do not invent which circuits are safe, gas-cap rules, or permit needs for a hot plate. Tag unknown electrical or gas items [VERIFY] for a licensed electrician or plumber.

💡

Pro tip: Pick the room that still has a sink. A bedroom hot plate with no water nearby turns every meal into a shuttle.

Dust Barrier Daily Checklist

22/30

✨ What it does

Produces twelve dust-barrier checkboxes and up to five missing-supply lines from what you already own. Call a licensed tester before you disturb old paint or popcorn ceiling.

Checklist dust containment for [ROOMS OPEN] while we sleep in [ROOMS CLOSED]. Supplies I have: [SUPPLIES ON HAND]. Pets or kids: [HOUSEHOLD CONSTRAINTS]. Output 12 checkbox lines grouped into zip walls, HVAC, and daily wipe-down, each under 15 words. Then up to 5 supplies the checklist needs that are not in my list. Filter ratings, asbestos rules and lead-safe methods you cannot find in my notes stay [VERIFY]; I will ask a licensed tester about older paint or popcorn ceiling. Never invent a product name or a legal method to complete a checkbox.

💡

Pro tip: Say which return air grille is in the work zone, then tape it before the first cut.

Water Off Too Long

23/30

✨ What it does

Gives six checks you can do with the tools you listed, plus an 80-word plumber script from the outage you described. Read the plumber script aloud before you call, and confirm shutoffs only with a licensed plumber.

Troubleshoot from these symptoms: water has been off longer than [HOURS OFF], fixtures affected: [FIXTURES], crew explanation I was given: [CREW NOTES]. Household impact: [HOUSEHOLD IMPACT]. Give 6 numbered checks I can do using only [TOOLS I HAVE], each under 20 words, then an 80-word script to read to the plumber. Do not invent isolation valve locations, boil-water rules, or code. Leave any valve location I did not give as [VERIFY]. A licensed plumber confirms shutoffs.

💡

Pro tip: Write how many hours the water has been off and which tap you tried last. Vague outages get vague answers.

Kids and Pets Site Brief

24/30

✨ What it does

Fills an eight-line kids-and-pets site brief plus a 40-word door note. Read the paint can for cure time before you treat a room as safe to sleep in.

Here is today's site log: [SITE LOG]. Household: [KIDS PETS NOTES]. Hours crew is in: [CREW HOURS]. Fill a daily brief of 8 lines: wet floors, open stairs, parked tools, paint fumes I was told about, pet door status, school-run path, quiet room, and who to text. Each line under 18 words. Then a 40-word note I can tape at the door. Do not invent chemical names, cure times, or whether fumes are safe. Missing product or cure data stays [VERIFY] on the can or with the painter. This is not medical advice.

💡

Pro tip: Map the school-run path room by room. A taped stair is useless if the backpacks live on the work side.

Upstairs House Rules Critique

25/30

✨ What it does

Scores your house rules on bathroom, kitchen and quiet hours, then rewrites ten numbered rules plus a 60-word crew version. Check insurance and lease language in the papers you actually hold.

Read my living-upstairs house rules draft: [HOUSE RULES DRAFT]. Crew size and hours from my notes: [CREW NOTES]. Score the draft out of 10 on three lines: bathroom access, kitchen hours, and quiet hours I wrote. Then rewrite as 10 numbered house rules, each under 18 words, plus a 60-word version for a crew group chat. Flag any insurance, HOA or lease rule I did not paste as [VERIFY]. Do not invent what my policy covers.

💡

Pro tip: State which bathroom the crew may use, so upstairs access stays clear on paper.

Go from copy-pasting to actually mastering AI.

AI Academy: hands-on tutorials on ChatGPT, Claude, Midjourney, and many other tools. New tutorials are added regularly.

Start Your Free Trial

Punch and Closeout

5 prompts

Change Order Email Draft

26/30

✨ What it does

Drafts a 120-word change-order email and a figure table of up to six rows, one per extra item. Read your contract before you treat a blank clause as agreed.

You are drafting a change-order email I will send. Extra work requested: [EXTRA WORK]. Original scope I have in writing: [ORIGINAL SCOPE]. Figures I was given: [FIGURES I WAS GIVEN]. Output a 120-word email plus a table of up to 6 rows, one per extra item I wrote: Item, In original scope?, Amount I was told, Who pays per my notes, Date needed, Open. Copy every figure from my paste. Do not invent amounts, markup, or contract clauses. Any date or payer I did not give: write [VERIFY] in that cell.

💡

Pro tip: Paste the original scope sentence next to the extra work. Side by side is how you see a true add versus a restatement.

Punch List From My Walk Notes

27/30

✨ What it does

Turns walk notes into a punch table of up to twelve rows plus five unlocated items. Photograph each defect before you send the table to a trade.

Build a punch-list table from my walk notes: [WALK NOTES]. Rooms: [ROOM LIST]. Output up to 12 rows, one per defect I wrote; stop when my notes run out. Columns: Room, Defect in my words, Photo file I named, Trade, Wanted fix I described. Then 5 bullets of items I mentioned in passing but did not locate, tagged [VERIFY]. Anything I did not write as a defect stays off the table; inventing a crack I never saw is worse than a short list. Lien, retainage, code and warranty terms I did not paste stay [VERIFY] until I read my own contract.

💡

Pro tip: Walk with the lights on and off, and check caulk under the vanity light as well as overhead, before you close a room.

Warranty Versus Receipts Folders

28/30

✨ What it does

Compares warranty papers and receipts in six rows, then says in 70 words which folder to hand a future buyer first. Copy serial numbers off the plates before you file anything.

Compare a warranty folder versus a receipts folder using only what I listed. Warranty papers: [WARRANTY LIST]. Receipts and lien papers: [RECEIPT AND LIEN LIST]. Table with 6 rows and columns Area, Warranty paper I listed, Receipt or lien paper I listed, Still missing. Row labels: Appliances, Roof or exterior, Waterproofing, Paint colors, Paid invoices, Open claims. Then 70 words on which folder to hand a future buyer first. Do not invent warranty lengths, coverage, or lien waiver law. Missing serial numbers or dates stay [VERIFY] on the plate or the receipt.

💡

Pro tip: Put paint color chips in the receipts folder so a later touch-up is not guessing from a faded can.

Finish Mismatch Three Fixes

29/30

✨ What it does

Offers three mismatch fixes in a table, then picks one in 60 words from the material you still have. Check the lot sticker on a leftover box before you order more.

Give 3 options for a finish mismatch I found: [MISMATCH NOTES]. Remaining material: [MATERIAL LEFT]. Trade still on site: [TRADE]. Table columns: Option, What we do, Days I estimated, Material I still have, Risk I named. Then pick one in 60 words. Do not invent dye lots, extra-box amounts, or whether the mismatch fails a code or warranty. If a lot number or a restock rule is missing, write [VERIFY]. If my notes give no time or risk for an option, write [VERIFY] in that cell. I decide with the trade.

💡

Pro tip: Check the mismatch by the window and under the hallway light before you choose a fix.

Final Walk Eight Steps

30/30

✨ What it does

Lists eight final-walk steps and a one-row-per-step paper table from documents you already hold. Read retainage and lien language in your own contract, not in the chat.

Act as a close-out clerk. Contract notes I have: [CONTRACT NOTES]. Remaining work: [REMAINING WORK]. Documents in hand: [DOCS IN HAND]. Write 8 numbered steps for the final walk, each under 22 words, covering keys, manuals, paint codes, breaker map, and papers I already hold. Then a table with one row per step: Step, Paper I hold, Paper still missing. Do not invent retainage rules, lien timelines, or what I may withhold. Tag missing legal papers [VERIFY] and tell me to read my contract or ask my own advisor. Not legal advice.

💡

Pro tip: Collect paint codes and leftover cans on the same day. They vanish the afternoon the last painter leaves.

Free tool

Prompt Optimizer

Turn a rough idea into a structured, professional AI prompt.

Try it free →

Frequently Asked Questions

No. It can turn your notes into questions for the local building department. Permit triggers, fees and inspections come from your city. Tag blanks [VERIFY] and call the clerk yourself.
Paste the scope lines and figures you want compared. You can hide names and addresses. Totals must come from the quote you pasted. If a figure is missing, the reply should show [VERIFY], not a guess.
No. These prompts help you organise lists, questions and trackers. Building codes, contracts, loan terms and taxes stay with your city, your own contract and your lender. You decide what to sign.
Put every amount in a bracket or in quote text you paste. Ask for a table that copies those figures. Empty cells should read [VERIFY]. Do not ask it to estimate what a trade should charge.
Do not count on it. A new chat may not carry your details, and memory can recall them wrongly. Paste the same notes, quotes and punch list each time so the answer rests on your paper.