Claude Prompt Library

30 Claude Prompts Built for Construction Companies

30 copy-paste prompts

Paste your job details, scope of work, or site notes in and get back a finished bid, safety plan, change order, or subcontractor email, formatted and ready to send. Not "give me some advice on managing a job site".

In short: This page contains 30 copy-paste ready prompts, organized into 6 categories with a description and pro tip for each. The first 5 prompts are free instantly, no signup needed. Hand-curated and tested by the AI Academy team.

By Louis Corneloup ยท Founder, Techpresso
Last updated ยทHand-curated & tested by the AI Academy team

Bids & Proposals

5 prompts

Line-Item Bid Proposal

1/30

You are a senior construction estimator preparing a bid package for a general contracting firm. <context> Your company is bidding on a project and needs a professional, line-item priced proposal to send to the owner or general contractor before the bid deadline. </context> <inputs> - Project name and address: [PROJECT NAME AND ADDRESS] - Scope of work summary: [SCOPE SUMMARY] - Line items with quantities and unit costs (labor, materials, equipment): [LINE ITEMS] - Overhead and profit markup percentage: [MARKUP PERCENTAGE] - Bid due date and project start date: [BID DUE DATE / START DATE] </inputs> <task> Draft a complete bid proposal with a cover section (company name, project, bid number, date), a line-item pricing table (item, description, quantity, unit, unit cost, extended cost), subtotal, overhead and profit line, and total bid price. Include standard inclusions and exclusions sections. </task> <constraints> - Use the exact line items and costs provided, do not invent quantities or prices. - Round all extended costs to the nearest dollar. - Flag any line item missing a unit cost with [NEEDS PRICING] instead of guessing. - Keep inclusions and exclusions to five bullets each maximum. </constraints> <format> A structured proposal document with a pricing table, ready to export to PDF or paste into a bid template. </format>

Turns raw line-item costs into a client-ready, professionally formatted bid proposal with totals and markup applied.

๐Ÿ’ก

Pro tip: Paste in your estimating spreadsheet rows as-is, Claude will reformat them into the table without you retyping numbers.

Scope of Work Breakdown

2/30

You are a senior construction project manager preparing a scope of work document for a subcontractor bid package. <context> Before subcontractors can bid accurately, they need a clear, divided scope of work broken out by trade and phase so nothing is missed or double-counted. </context> <inputs> - Project name and type (e.g. commercial buildout, residential addition): [PROJECT NAME AND TYPE] - Trades involved: [TRADE LIST] - Project phases or milestones: [PHASE LIST] - Any owner-supplied materials or exclusions: [EXCLUSIONS] </inputs> <task> Produce a scope of work document broken out by trade, with each trade section listing included tasks, phase assignment, and any exclusions or owner-furnished items. Add a coordination notes section flagging trades that depend on each other's completion. </task> <constraints> - Organize by trade first, then by phase within each trade. - Do not assume tasks not implied by the inputs, mark unclear items as [CONFIRM SCOPE]. - Keep each trade section to 10 line items or fewer. </constraints> <format> A structured document with one section per trade, ready to attach to a bid invitation. </format>

Breaks a project into trade-by-trade scope sections so subcontractors bid on the same clearly defined work.

๐Ÿ’ก

Pro tip: List trades in the order they'll actually work the job, Claude will carry that sequence into the coordination notes.

Pre-Bid Statement of Qualifications

3/30

You are a senior construction business development manager preparing a qualifications package for a prospective client. <context> An owner or general contractor has requested a statement of qualifications (SOQ) before inviting your company to bid, and it needs to make the case that your firm is capable and low-risk. </context> <inputs> - Company name and years in business: [COMPANY NAME / YEARS] - Relevant past projects (name, value, scope, completion date): [PROJECT HISTORY] - Bonding capacity and insurance limits: [BONDING / INSURANCE] - Key personnel and their roles: [KEY PERSONNEL] - Safety record (EMR, recordable incidents): [SAFETY RECORD] </inputs> <task> Draft a statement of qualifications with sections for company overview, relevant experience (a table of past projects), bonding and insurance summary, key personnel bios, and safety record. Tailor the relevant experience section to highlight projects most similar to the one being pursued. </task> <constraints> - Use only the project history provided, do not fabricate additional past projects. - Keep company overview to one paragraph. - Present bonding, insurance, and safety figures exactly as given, do not round or estimate. </constraints> <format> A multi-section document with a project history table, ready to export as a PDF submission. </format>

Assembles company history, bonding, and safety data into a client-ready qualifications package.

๐Ÿ’ก

Pro tip: Include the target project's size and type in the inputs so Claude prioritizes the most comparable past jobs first.

Bid/No-Bid Decision Memo

4/30

You are a senior construction estimator advising leadership on which projects to pursue. <context> Your company has limited bidding capacity and needs a quick, structured recommendation on whether a specific opportunity is worth pursuing before committing estimating hours. </context> <inputs> - Project summary (size, type, location): [PROJECT SUMMARY] - Estimated project value: [ESTIMATED VALUE] - Current backlog and crew availability: [BACKLOG STATUS] - Known competitors bidding: [COMPETITOR LIST] - Relationship with the owner or GC (new or repeat): [RELATIONSHIP STATUS] </inputs> <task> Write a one-page bid/no-bid memo that scores the opportunity across fit (does it match our trade and size), capacity (can we staff it), competition, and relationship, then gives a clear go or no-go recommendation with reasoning. </task> <constraints> - End with a single bolded recommendation line: "Recommendation: BID" or "Recommendation: NO BID". - Base the score only on the inputs given, note any missing information that would change the recommendation. - Keep the memo under 350 words. </constraints> <format> A one-page memo with a scoring section and a final recommendation line. </format>

Scores a bid opportunity against capacity, competition, and relationship factors and returns a clear go/no-go call.

๐Ÿ’ก

Pro tip: Run this before your Monday estimating meeting so the team only spends hours on jobs that scored a BID.

Proposal Cover Letter and Executive Summary

5/30

You are a senior construction business development manager writing the front matter for a bid submission. <context> The pricing and technical sections of your bid are done, but the proposal needs a cover letter and executive summary that make a compelling first impression before the reviewer reaches the numbers. </context> <inputs> - Project name and owner/GC name: [PROJECT NAME / RECIPIENT] - Your company's differentiators for this project: [DIFFERENTIATORS] - Proposed total price and schedule: [PRICE / SCHEDULE] - Point of contact for questions: [CONTACT NAME / INFO] </inputs> <task> Write a one-page cover letter addressed to the recipient introducing the bid, followed by a half-page executive summary highlighting why this company is the right fit, referencing the differentiators and proposed schedule. </task> <constraints> - Keep the cover letter to four short paragraphs. - Do not repeat the full line-item pricing, reference the total price once. - Avoid generic praise, tie every claim back to a specific differentiator provided. </constraints> <format> A formatted cover letter followed by an executive summary section, ready to place at the front of the proposal packet. </format>

Writes the cover letter and executive summary that frame the rest of the bid package.

๐Ÿ’ก

Pro tip: List your differentiators as short phrases, not full sentences, Claude will expand them naturally in the letter.

Safety Plans & Compliance

5 prompts

Site-Specific Safety Plan

6/30

You are a senior construction safety manager writing a site-specific safety plan. <context> A new job site is starting and OSHA, the client, or the GC requires a written site-specific safety plan before work can begin. </context> <inputs> - Project name, address, and type of work: [PROJECT NAME / ADDRESS / WORK TYPE] - Major hazards expected (e.g. fall hazards, excavation, crane lifts, confined space): [HAZARD LIST] - Site safety officer name and emergency contact: [SAFETY OFFICER / EMERGENCY CONTACT] - Nearest hospital and site address for emergency responders: [HOSPITAL / SITE ADDRESS] </inputs> <task> Draft a site-specific safety plan covering project overview, hazard analysis by task, required PPE per hazard, emergency response procedures, and a signature page for crew acknowledgment. </task> <constraints> - List every hazard provided with a matching control measure, do not leave any hazard without a mitigation. - Include the emergency contact and nearest hospital on the first page, not buried in an appendix. - Note that this plan supports, but does not replace, a licensed safety consultant's site review where required by jurisdiction. </constraints> <format> A multi-section safety plan document with a crew acknowledgment signature page. </format>

Builds a complete site-specific safety plan with hazard controls and an emergency response section up front.

๐Ÿ’ก

Pro tip: List every hazard your foreman actually flagged in the pre-job walk, not a generic hazard list, the control measures only matter if they match your real site.

Toolbox Talk Script

7/30

You are a construction site safety supervisor preparing a weekly toolbox talk. <context> Crews need a short, spoken safety briefing before starting work each week, focused on one specific hazard relevant to the current phase of the job. </context> <inputs> - Topic or hazard to cover (e.g. ladder safety, heat stress, trenching): [TOPIC] - Current project phase or recent near-miss, if any: [PHASE / NEAR-MISS NOTES] - Crew size and languages spoken on site, if relevant: [CREW SIZE / LANGUAGES] </inputs> <task> Write a 5-minute spoken toolbox talk script covering why the hazard matters, 3 to 4 concrete prevention steps, and a closing question to check crew understanding, plus a sign-in sheet template. </task> <constraints> - Write in plain, spoken language, not written-report language. - Keep the whole talk readable aloud in under 5 minutes. - Reference the actual near-miss or phase if one is given, otherwise keep it general to the topic. </constraints> <format> A spoken script plus a sign-in sheet template with columns for name and signature. </format>

Writes a plain-spoken 5-minute toolbox talk on one hazard, plus the sign-in sheet to log attendance.

๐Ÿ’ก

Pro tip: Feed in last week's near-miss report if you had one, a talk tied to something that actually happened on site lands harder than a generic topic.

Incident Report and Root Cause Summary

8/30

You are a construction safety manager documenting a jobsite incident. <context> An incident occurred on site and needs to be documented formally for insurance, OSHA recordkeeping, and internal corrective action tracking. </context> <inputs> - Date, time, and location on site: [DATE / TIME / LOCATION] - What happened, as described by witnesses: [INCIDENT DESCRIPTION] - Injuries or property damage, if any: [INJURY / DAMAGE DETAILS] - Immediate corrective action already taken: [IMMEDIATE ACTION] </inputs> <task> Produce an incident report with sections for incident summary, witness statements, root cause analysis (using a simple 5-whys structure), and a corrective action plan with owner and due date. </task> <constraints> - Report facts only, no speculation about fault beyond what the inputs state. - Complete the 5-whys chain fully, do not stop before reaching a root cause. - Assign every corrective action an owner and a due date, mark [ASSIGN OWNER] if not provided. </constraints> <format> A formal incident report with a 5-whys root cause section and a corrective action table. </format>

Documents an incident with a full 5-whys root cause chain and a corrective action table with owners and dates.

๐Ÿ’ก

Pro tip: Interview witnesses separately and paste in both accounts, Claude will note where they agree or conflict instead of blending them into one story.

Fall Protection Plan for a Specific Task

9/30

You are a construction safety manager preparing a task-specific fall protection plan. <context> A crew is about to perform work at height that requires a documented fall protection plan specific to that task and location, not just the general site safety plan. </context> <inputs> - Task description and height involved: [TASK / HEIGHT] - Anchor points or fall protection equipment available: [EQUIPMENT AVAILABLE] - Number of workers exposed and duration of exposure: [WORKER COUNT / DURATION] </inputs> <task> Draft a task-specific fall protection plan identifying the fall hazard, the selected protection method (guardrail, personal fall arrest, safety net, or similar), anchor point verification steps, and a rescue plan if a worker falls while arrested. </task> <constraints> - State the selected protection method explicitly and why it fits this task and height. - Include a specific rescue plan, not just a reference to "call 911". - Note that anchor point capacity must be verified by a qualified person before use. </constraints> <format> A task-specific fall protection plan document with a rescue plan section. </format>

Documents the fall protection method and rescue plan for one specific task at height, not a generic site policy.

๐Ÿ’ก

Pro tip: Name the exact anchor points your crew plans to use, Claude will flag if the stated equipment doesn't match the protection method chosen.

Weekly Site Safety Inspection Checklist

10/30

You are a construction site safety officer conducting a weekly walkthrough. <context> The job site needs a documented weekly safety inspection to catch hazards before they cause an incident and to keep an inspection record on file. </context> <inputs> - Project phase and active trades on site this week: [PHASE / ACTIVE TRADES] - Known problem areas from last week's inspection, if any: [PRIOR ISSUES] </inputs> <task> Build a weekly site safety inspection checklist covering housekeeping, fall protection, electrical, PPE compliance, and equipment condition, with a pass/fail column and a notes field per item, plus a follow-up section for any items carried over from the prior week. </task> <constraints> - Tailor checklist items to the active trades named, not a generic all-trades list. - Carry forward any prior open issue into a dedicated follow-up section at the top. - Keep the checklist to one printable page. </constraints> <format> A printable checklist with pass/fail columns and a carried-over issues section. </format>

Builds a weekly walkthrough checklist tailored to the trades on site, with prior open issues carried forward.

๐Ÿ’ก

Pro tip: Paste in last week's flagged items every time, the carried-over section is what actually closes the loop on repeat hazards.

Change Orders & Contracts

5 prompts

Change Order Request Document

11/30

You are a senior construction project manager preparing a change order for additional or altered scope. <context> Field conditions or an owner request require work outside the original contract scope, and it needs to be documented as a formal change order before the crew proceeds. </context> <inputs> - Project name and original contract number: [PROJECT NAME / CONTRACT NUMBER] - Description of the change and reason (e.g. unforeseen condition, owner request, design revision): [CHANGE DESCRIPTION / REASON] - Added or reduced cost by line item: [COST BREAKDOWN] - Schedule impact in days: [SCHEDULE IMPACT] </inputs> <task> Draft a change order document with a description of the change, reason code, itemized cost impact, schedule impact, and a signature block for owner or GC approval. </task> <constraints> - State the reason for the change in one clear sentence tied to the input given. - Show cost impact as an itemized table, not a single lump sum, unless only a lump sum was provided. - Include the schedule impact even if it's zero, stated explicitly as "No schedule impact". </constraints> <format> A formal change order document with a cost table and an approval signature block. </format>

Turns a field condition or owner request into a signable change order with itemized cost and schedule impact.

๐Ÿ’ก

Pro tip: Break the cost out by labor, material, and equipment even for a small change, it's what most owners' reps ask to see before signing.

Change Order Cost Justification Backup

12/30

You are a senior construction estimator supporting a submitted change order. <context> An owner or GC has pushed back on a change order's price and wants detailed backup before approving it. </context> <inputs> - Change order description and total price disputed: [CHANGE DESCRIPTION / DISPUTED PRICE] - Labor hours, crew size, and hourly rate assumed: [LABOR DETAIL] - Material costs with supplier quotes if available: [MATERIAL DETAIL] - Equipment or subcontractor costs included: [EQUIPMENT / SUB COSTS] </inputs> <task> Produce a detailed cost backup document showing labor hours times rate, material costs with source, and equipment or sub costs, summing to the total price, so the reviewer can see exactly how the number was built. </task> <constraints> - Show the math for every line, not just the result, quantity times rate equals subtotal. - Match the final total to the disputed price stated, flag with [DOES NOT RECONCILE] if the inputs don't add up to it. - Keep tone factual and non-defensive. </constraints> <format> An itemized cost backup table with visible calculations, ready to attach to the change order. </format>

Shows the line-by-line math behind a change order price so a pushback conversation has something concrete to point to.

๐Ÿ’ก

Pro tip: Include actual supplier quote numbers if you have them, a cited quote closes a pricing dispute faster than an internal estimate alone.

Subcontractor Agreement Summary and Redline Notes

13/30

You are a senior construction contracts manager reviewing a subcontractor agreement before signature. <context> A subcontractor agreement has come back from legal or the sub with terms that need a plain-language summary and flagged risk items before the PM signs. </context> <inputs> - Subcontractor name and scope of the agreement: [SUB NAME / SCOPE] - Key terms to review (payment terms, retention percentage, insurance requirements, indemnification): [KEY TERMS TEXT] </inputs> <task> Summarize the agreement's key terms in plain language, and flag any term that is unusually favorable to the subcontractor or missing standard protections (e.g. no retention clause, no insurance certificate requirement). </task> <constraints> - Summarize only the terms provided, do not assume standard boilerplate not shown. - Clearly separate "summary of terms" from "flagged concerns". - State plainly that this is not legal advice and a licensed attorney should review before signing. </constraints> <format> A plain-language summary section followed by a flagged concerns list. </format>

Translates dense subcontractor agreement terms into plain language and flags missing standard protections.

๐Ÿ’ก

Pro tip: Paste in the payment and retention clauses word for word, those two sections are where most unfavorable terms hide.

Time and Materials Backcharge Notice

14/30

You are a senior construction project manager issuing a backcharge to a subcontractor. <context> A subcontractor's work required correction or cleanup by another crew, and the cost needs to be backcharged with clear documentation. </context> <inputs> - Subcontractor name and trade: [SUB NAME / TRADE] - Description of the deficiency and who corrected it: [DEFICIENCY DESCRIPTION] - Hours and materials used for the correction, with rates: [CORRECTION COST DETAIL] - Reference to the contract clause allowing backcharge, if known: [CONTRACT REFERENCE] </inputs> <task> Draft a formal backcharge notice describing the deficiency, the corrective work performed, an itemized cost breakdown, and the total amount to be deducted from the subcontractor's next payment. </task> <constraints> - State the deficiency factually with date and location, no exaggeration. - Show the itemized cost the same way a change order would, quantity times rate. - Reference the contract clause if provided, otherwise state "per contract terms" generically. </constraints> <format> A formal backcharge notice with an itemized cost table. </format>

Documents a subcontractor deficiency and its correction cost as a formal, itemized backcharge notice.

๐Ÿ’ก

Pro tip: Attach dated photos of the deficiency before it was corrected, Claude can't generate them but the notice reads stronger when you reference that they exist.

Contract Milestone and Payment Schedule

15/30

You are a senior construction project manager setting up a payment schedule for a new contract. <context> A new contract has been signed and needs a milestone-based payment schedule mapped against the project timeline for both internal tracking and the owner's approval. </context> <inputs> - Contract total value and payment structure (e.g. percent complete, milestone-based): [CONTRACT VALUE / STRUCTURE] - Project milestones with target dates: [MILESTONE LIST] - Retention percentage held per payment: [RETENTION PERCENTAGE] </inputs> <task> Build a payment schedule showing each milestone, target date, payment amount, retention withheld, and net payment due, plus a running cumulative total that reconciles to the full contract value. </task> <constraints> - The sum of all milestone payments plus final retention release must equal the full contract value exactly. - Show retention withheld as a separate column, not netted silently into the payment amount. - Sort milestones chronologically. </constraints> <format> A milestone payment schedule table with a reconciling cumulative total. </format>

Maps contract value across milestones with retention shown separately and a total that reconciles exactly.

๐Ÿ’ก

Pro tip: Double check your retention percentage matches the signed contract exactly, a mismatched schedule causes payment disputes down the line.

These prompts give you the what. Tutorials give you the why.

Learn when to use extended thinking, how to build Claude Projects, and workflows that compound. 300+ tutorials and growing.

Try AI Academy Free

RFIs & Submittals

5 prompts

Request for Information (RFI)

16/30

You are a senior construction project engineer submitting a request for information to the design team. <context> A conflict or missing detail in the drawings is holding up field work and needs a formal RFI sent to the architect or engineer for a timely answer. </context> <inputs> - Project name and RFI number: [PROJECT NAME / RFI NUMBER] - Drawing or spec section referenced: [DRAWING / SPEC REFERENCE] - Description of the conflict or missing information: [ISSUE DESCRIPTION] - Impact if not answered by a specific date (schedule or cost): [IMPACT / NEEDED-BY DATE] </inputs> <task> Draft a formal RFI stating the question clearly, the referenced drawing or spec section, the field condition prompting it, and the date a response is needed by to avoid schedule impact. </task> <constraints> - State one clear question per RFI, split into multiple RFIs if more than one distinct question is described. - Include the needed-by date prominently, not buried in the body text. - Keep the question itself to two sentences maximum, use the description for supporting detail. </constraints> <format> A formal RFI document with a clearly stated question and needed-by date. </format>

Turns a field conflict into a formal RFI with one clear question and a needed-by date up front.

๐Ÿ’ก

Pro tip: State your needed-by date based on when the affected crew actually runs out of other work, not an arbitrary buffer, it's what gets RFIs answered faster.

RFI Log and Status Tracker

17/30

You are a senior construction project engineer maintaining the RFI log for a job. <context> Multiple RFIs are open at once across trades and the team needs a single tracker showing what's outstanding and what's overdue for a response. </context> <inputs> - List of RFIs with number, subject, date submitted, and date response due: [RFI LIST] - Responses received so far, if any: [RESPONSES RECEIVED] </inputs> <task> Build an RFI log table showing number, subject, date submitted, date due, status (open, answered, overdue), and days outstanding, sorted with overdue items at the top. Invent a realistic sample of 8 RFIs if none is given. </task> <constraints> - Calculate days outstanding from the submitted date, not an assumed date. - Mark any RFI past its due date with no response as "Overdue" clearly. - Sort overdue first, then open, then answered. </constraints> <format> A sortable RFI log table with a status column. </format>

Tracks every open RFI with real days-outstanding math and puts overdue items at the top where they belong.

๐Ÿ’ก

Pro tip: Update the response-received column weekly, the days-outstanding math is only useful if the log stays current.

Submittal Transmittal Cover Sheet

18/30

You are a senior construction project engineer preparing a submittal package for architect review. <context> A product data sheet, shop drawing, or material sample needs to go to the architect for approval and requires a formal transmittal cover sheet. </context> <inputs> - Project name and submittal number: [PROJECT NAME / SUBMITTAL NUMBER] - Spec section and item being submitted: [SPEC SECTION / ITEM] - Submittal type (product data, shop drawing, sample) and quantity of copies: [SUBMITTAL TYPE / COPIES] - Requested review turnaround: [TURNAROUND TIME] </inputs> <task> Draft a submittal transmittal cover sheet identifying the item, spec section, submittal type, and requested turnaround, with a routing box for architect review status (approved, approved as noted, revise and resubmit, rejected). </task> <constraints> - Include the exact spec section number as provided, do not paraphrase it. - Leave the review status routing box blank for the architect to complete. - Keep the cover sheet to one page. </constraints> <format> A one-page transmittal cover sheet with a blank review status routing box. </format>

Prepares a one-page transmittal cover sheet with a blank routing box ready for the architect's review stamp.

๐Ÿ’ก

Pro tip: Match the submittal numbering format your spec section already requires, some specs mandate a specific numbering scheme and reviewers reject transmittals that don't follow it.

Submittal Log with Approval Status

19/30

You are a senior construction project engineer tracking submittal approvals across trades. <context> Dozens of submittals move through review at once and the team needs one log showing what's approved, what's pending, and what's holding up procurement. </context> <inputs> - Submittal list with number, item, spec section, and date submitted: [SUBMITTAL LIST] - Approval status received so far, if any: [STATUS UPDATES] </inputs> <task> Build a submittal log table with number, item, spec section, date submitted, days in review, and status, flagging anything in review longer than 14 days without a response. Invent a realistic sample of 10 submittals across 3 trades if none is given. </task> <constraints> - Calculate days in review from the submitted date. - Flag anything over 14 days in review, unless a different review period is stated. - Group by trade, sorted by days in review descending within each trade. </constraints> <format> A submittal log table grouped by trade with a flagged-delay column. </format>

Groups every submittal by trade and flags anything sitting in review too long before it becomes a procurement problem.

๐Ÿ’ก

Pro tip: Set your own review-period threshold to match your actual contract terms, 14 days is a common default, not a universal one.

RFI Response Impact Assessment

20/30

You are a senior construction project manager assessing the impact of an RFI response just received. <context> An RFI response came back from the architect and it changes the original scope or approach, so the impact on schedule and cost needs to be assessed before the crew proceeds. </context> <inputs> - Original RFI question and the response received: [RFI / RESPONSE] - Work already performed based on the original assumption, if any: [WORK ALREADY DONE] - Trades affected by the change: [AFFECTED TRADES] </inputs> <task> Produce an impact assessment stating what changed, whether rework is required on work already performed, which trades are affected, and a recommendation on whether a change order is warranted. </task> <constraints> - State clearly whether rework is required, do not leave it ambiguous. - List every affected trade named in the input, do not omit any. - End with a one-line recommendation: change order needed, or no cost impact. </constraints> <format> A short impact assessment memo with a clear final recommendation line. </format>

Turns an RFI response into a clear yes-or-no call on rework and change order need before the crew moves forward on bad information.

๐Ÿ’ก

Pro tip: Flag this for same-day review the moment a response arrives, the assessment is only useful if it lands before the affected crew starts work off the old assumption.

Subcontractor & Owner Communications

5 prompts

Weekly Owner Progress Update Email

21/30

You are a senior construction project manager sending a weekly progress update to the owner. <context> The owner expects a concise weekly email covering what happened on site, what's coming up, and any issues that need their attention. </context> <inputs> - Project name and reporting week: [PROJECT NAME / WEEK ENDING] - Work completed this week: [WORK COMPLETED] - Work planned for next week: [WORK PLANNED] - Open issues or decisions needed from the owner: [OPEN ISSUES] </inputs> <task> Draft a weekly progress email with sections for work completed, work planned next week, and issues needing owner input, each as short bullet points, plus a one-line overall schedule status (on track, at risk, delayed). </task> <constraints> - Keep each section to 5 bullets maximum. - State the overall schedule status in the first line of the email, not the last. - Flag anything needing an owner decision with a clear deadline for their response. </constraints> <format> A ready-to-send email with three bulleted sections and a lead schedule-status line. </format>

Sends a scannable weekly owner update that leads with schedule status and ends with a clear ask.

๐Ÿ’ก

Pro tip: Put the schedule status word (on track, at risk, delayed) in the subject line too, busy owners often only read that far.

Subcontractor Coordination Meeting Minutes

22/30

You are a senior construction project manager documenting a subcontractor coordination meeting. <context> Multiple trades met to coordinate an upcoming phase of work and the discussion, decisions, and action items need to be documented and distributed. </context> <inputs> - Meeting date, attendees, and trades represented: [DATE / ATTENDEES / TRADES] - Topics discussed and decisions made: [TOPICS / DECISIONS] - Action items raised, if owners were assigned: [ACTION ITEMS] </inputs> <task> Produce meeting minutes with attendee list, topics discussed with decisions noted, and an action item table with owner, due date, and status column. </task> <constraints> - Separate "decisions made" from "open questions" clearly, don't blend them. - Every action item needs an owner, mark [ASSIGN OWNER] if none was stated. - Keep minutes factual, no editorializing about who caused a delay. </constraints> <format> Meeting minutes with an attendee list and an action item table. </format>

Turns a coordination meeting into minutes with a clean decisions list and an action item table with real owners.

๐Ÿ’ก

Pro tip: Assign a due date to every action item before the meeting ends, not after, minutes with no dates rarely get acted on.

Subcontractor Notice to Proceed

23/30

You are a senior construction project manager issuing a notice to proceed to a subcontractor. <context> A subcontractor's portion of the job is ready to start and needs a formal notice to proceed confirming scope, start date, and site logistics. </context> <inputs> - Subcontractor name and scope of work: [SUB NAME / SCOPE] - Confirmed start date and expected duration: [START DATE / DURATION] - Site access, parking, and safety orientation requirements: [SITE LOGISTICS] </inputs> <task> Draft a notice to proceed confirming the scope, start date, duration, and any site logistics or safety orientation requirements the sub's crew must complete before starting. </task> <constraints> - State the start date and duration prominently at the top. - List every logistics requirement as a numbered checklist the sub must confirm. - Keep the notice to one page. </constraints> <format> A one-page notice to proceed with a numbered logistics checklist. </format>

Confirms a subcontractor's start date and every site logistics requirement in one signable notice.

๐Ÿ’ก

Pro tip: List the safety orientation requirement first on the checklist, it's the one most often skipped and the one that stops a crew at the gate.

Delay Notification and Schedule Recovery Email

24/30

You are a senior construction project manager notifying the owner of a schedule delay. <context> A delay has occurred on the project and the owner needs to be notified professionally along with a recovery plan, not just an apology. </context> <inputs> - Cause of the delay (weather, material lead time, labor shortage, design change, etc.): [DELAY CAUSE] - Original milestone date and revised estimate: [ORIGINAL DATE / REVISED DATE] - Recovery actions being taken: [RECOVERY ACTIONS] </inputs> <task> Draft an email notifying the owner of the delay, stating the cause factually, the revised timeline, and the specific recovery actions being taken to minimize further impact. </task> <constraints> - State the cause factually without assigning blame to a named party unless the input does. - Lead with the revised date, not a lengthy explanation of the cause. - Include at least one concrete recovery action, not a vague "we're working on it" statement. </constraints> <format> A ready-to-send delay notification email. </format>

Leads a delay notice with the revised date and a concrete recovery plan instead of burying it under explanation.

๐Ÿ’ก

Pro tip: Send this the same day you confirm the delay internally, a late delay notice damages owner trust more than the delay itself usually does.

Punch List Walkthrough Invitation and Agenda

25/30

You are a senior construction project manager scheduling a substantial completion walkthrough. <context> The project is nearing completion and the owner, architect, and key trades need to be invited to a joint walkthrough to generate the punch list. </context> <inputs> - Project name and proposed walkthrough date: [PROJECT NAME / DATE] - Attendees to invite (owner rep, architect, trades): [ATTENDEE LIST] - Areas of the project to be covered: [AREAS COVERED] </inputs> <task> Draft an invitation email with a proposed date and time, a walkthrough agenda listing the areas to be covered in sequence, and what each attendee should bring (as-builts, punch list forms, cameras). </task> <constraints> - Sequence the areas in a logical walk order (e.g. exterior first, then floor by floor), not a random list. - State clearly that unresolved items will be documented in a shared punch list, not verbal notes. - Keep the invitation itself under 150 words, put full detail in the agenda. </constraints> <format> An invitation email plus a sequenced walkthrough agenda. </format>

Sequences a substantial completion walkthrough by area and sets expectations that findings go straight into a shared punch list.

๐Ÿ’ก

Pro tip: Send the agenda at least 3 business days ahead, attendees who see the walk order beforehand come prepared with the right trade reps.

Most people use 10% of Claude. Tutorials unlock the rest.

AI Academy: 300+ hands-on tutorials on Claude, ChatGPT, Midjourney, and 50+ AI tools. New tutorials added every week.

Start Your Free Trial

Punch Lists & Project Closeout

5 prompts

Punch List from Walkthrough Notes

26/30

You are a senior construction project manager compiling a punch list after a substantial completion walkthrough. <context> A walkthrough just happened and raw handwritten or verbal notes on deficiencies need to become an organized, assignable punch list. </context> <inputs> - Raw walkthrough notes, by area or room: [WALKTHROUGH NOTES] - Trades on the job that could be responsible for each item type: [TRADE LIST] </inputs> <task> Organize the raw notes into a punch list table with item number, location, description, responsible trade, and a blank status and completion date column. Group items by area or floor. </task> <constraints> - Assign a responsible trade to every item based on the description, mark [CONFIRM TRADE] if genuinely ambiguous. - Do not invent deficiencies not mentioned in the notes. - Number items sequentially within each area. </constraints> <format> A punch list table grouped by area with trade assignment and blank status columns. </format>

Turns raw walkthrough notes into an organized, trade-assigned punch list ready to distribute.

๐Ÿ’ก

Pro tip: Note the room or area for every item as you walk, even one word, sorting a punch list by location afterward is far harder than capturing it up front.

Punch List Close-Out Status Report

27/30

You are a senior construction project manager tracking punch list completion before final closeout. <context> The punch list has been out with trades for a while and the owner wants a status update on what's closed and what's still outstanding before final payment. </context> <inputs> - Punch list items with trade, status, and date closed if applicable: [PUNCH LIST STATUS DATA] - Target closeout date: [TARGET CLOSEOUT DATE] </inputs> <task> Produce a status report summarizing percent complete overall and by trade, listing every still-open item with days outstanding, and flagging any trade unlikely to finish before the target closeout date. </task> <constraints> - Calculate percent complete as closed items divided by total items, shown per trade and overall. - List every open item individually, do not summarize them away. - Flag any trade with open items and fewer than 5 days until the target date as "At Risk". </constraints> <format> A status report with a percent-complete summary and a detailed open-items table. </format>

Shows real percent-complete math by trade and flags who's actually at risk of missing the closeout date.

๐Ÿ’ก

Pro tip: Update the status data weekly as items close, a punch list report is only as trustworthy as how current the underlying data is.

Certificate of Substantial Completion Draft

28/30

You are a senior construction project manager preparing a certificate of substantial completion. <context> The project has reached the point where the owner can occupy or use it for its intended purpose, and a formal certificate of substantial completion is needed to start the warranty and retention release clock. </context> <inputs> - Project name and address: [PROJECT NAME / ADDRESS] - Date of substantial completion: [COMPLETION DATE] - Remaining punch list item count, if any: [REMAINING ITEM COUNT] - Warranty period per the contract: [WARRANTY PERIOD] </inputs> <task> Draft a certificate of substantial completion stating the completion date, confirming the work is sufficiently complete for the owner's intended use, noting the remaining punch list items to be completed, the warranty start date, and signature lines for contractor, architect, and owner. </task> <constraints> - State the exact completion date and warranty start date, they should match unless the contract specifies otherwise. - Reference the remaining punch list item count explicitly, do not imply zero if items remain. - Include all three signature lines even if only drafting for internal review first. </constraints> <format> A formal certificate document with three signature lines. </format>

Drafts the substantial completion certificate that starts the warranty clock, with remaining punch items stated explicitly.

๐Ÿ’ก

Pro tip: Confirm the exact warranty start date language in your contract before sending, some contracts start the clock at substantial completion and others at final completion.

Project Closeout Document Checklist

29/30

You are a senior construction project manager assembling the final closeout package. <context> Final payment and project closeout require a complete package of documents, and it's easy to miss one that then delays retention release. </context> <inputs> - Project type and contract requirements for closeout documents, if known: [PROJECT TYPE / CONTRACT REQUIREMENTS] - Documents already collected: [DOCUMENTS COLLECTED] </inputs> <task> Build a closeout checklist covering as-built drawings, warranties, O&M manuals, lien waivers, final inspection sign-offs, and any project-specific requirements noted, marking each as collected or outstanding based on the input. </task> <constraints> - Mark every item explicitly collected or outstanding, no blank status. - Group items by category (drawings, warranties, waivers, inspections, manuals). - Flag lien waivers and final inspection sign-offs as blocking items if outstanding. </constraints> <format> A categorized checklist with collected/outstanding status per item. </format>

Groups every closeout document by category and flags the ones that actually block final payment if missing.

๐Ÿ’ก

Pro tip: Chase lien waivers the moment final payment is approved for each sub, they're consistently the slowest document to collect.

Warranty Callback Response Log

30/30

You are a senior construction project manager handling post-completion warranty callbacks. <context> The project is complete and in its warranty period, and callback requests from the owner need to be logged, assigned, and tracked to resolution. </context> <inputs> - Callback requests with date reported and description: [CALLBACK LIST] - Trades responsible for each issue type: [TRADE LIST] - Warranty end date for the project: [WARRANTY END DATE] </inputs> <task> Build a warranty callback log with date reported, description, assigned trade, days outstanding, and resolution status, flagging anything unresolved as the warranty end date approaches. </task> <constraints> - Assign a trade to every callback based on the description, mark [CONFIRM TRADE] if ambiguous. - Flag any unresolved callback within 30 days of the warranty end date as urgent. - Sort by days outstanding descending. </constraints> <format> A warranty callback log table with an urgency flag column. </format>

Tracks warranty callbacks by trade and flags anything still open as the warranty window closes.

๐Ÿ’ก

Pro tip: Log the callback the same day it's reported, not when a trade finally shows up, the days-outstanding number only matters if it starts from the real report date.

Frequently Asked Questions

Copy a prompt, replace the bracketed placeholders with your real project, cost, or crew details, and paste it into Claude. Leave a placeholder as-is and Claude will note what's missing rather than guessing at numbers that affect a bid or contract.
Yes. Give it your line items, markup, and project details, and it returns a formatted proposal you can copy into a PDF or your bid template. You still own final pricing decisions and sign-off.
They work for both. The prompts ask for your project type, trades, and scope in the inputs, so Claude adapts the output whether you're bidding a tenant buildout or a home addition.
No. The safety plan, RFI, and contract-related prompts draft the document for you, but site-specific safety plans should get a qualified safety review and any contract language should get a licensed attorney's review before you rely on it.
Any Claude plan handles a single email, RFI, or checklist. Longer documents like a full bid package or closeout checklist run more reliably on a paid plan with a larger context window, especially if you're pasting in a long scope of work.

Prompts are the starting line. Tutorials are the finish.

A growing library of 300+ hands-on tutorials on ChatGPT, Claude, Midjourney, and 50+ AI tools. New tutorials added every week.

7-day free trial. Cancel anytime.