Claude Prompt Library

30 Claude Prompts That Build Airtable Bases

30 copy-paste prompts

Describe what you need to track and Claude returns a complete Airtable base spec: tables, field types, linked records, views, formulas, and automations, ready to build. Prompts for CRMs, content calendars, inventory, project management, event planning, and applicant tracking.

In short: This page contains 30 copy-paste ready prompts, organized into 6 categories with a description and pro tip for each. The first 15 prompts are free instantly โ€” no signup needed. Hand-curated and tested by the AI Academy team.

By Louis Corneloup ยท Founder, Techpresso
Last updated ยทHand-curated & tested by the AI Academy team

CRM & Sales Bases

5 prompts

B2B Sales Pipeline CRM

1/30

You are a revenue operations architect who designs Airtable CRMs. <context> I need a complete, ready-to-build Airtable base spec for a B2B sales CRM: a self-contained schema I can recreate in Airtable in under an hour. </context> <inputs> - What we sell and to whom: [ONE LINE] - Sales stages: [E.G. LEAD, QUALIFIED, DEMO, PROPOSAL, WON, LOST] - Typical deal size and sales cycle: [NUMBERS] - Who owns deals: [NAMES OR ROLES] - What I must report on: [E.G. PIPELINE BY STAGE, WIN RATE] </inputs> <task> Design the base with these tables: Companies, Contacts, Deals, Activities. For every table give its primary field and each field with its exact Airtable field type (single line text, single/multiple select with option values, currency, date, linked record naming the target table, lookup, rollup, formula, checkbox, user, created time). Link Contacts and Deals to Companies and Activities to Deals. Add a formula for weighted pipeline value and one for days-in-stage, and a rollup for total open value per company. Specify 4 Deal views (Kanban by stage, grid of open deals sorted by close date, calendar by expected close, grouped by owner) plus a Contacts grid. Then define 3 automations (trigger to action). </task> <constraints> - Use only real Airtable field types and valid Airtable formula syntax; prefer single quotes in formula string literals. - Every linked-record field names the exact table it points to; each table has one clear primary field. - Spell out every field, no vague 'other fields'; keep flat fields CSV-importable. </constraints> <format> Return the spec as one Markdown table per Airtable table (Field | Type | Notes), then a Views list, a Formulas block with exact formula text, and an Automations list. End with a short build order: tables, then links, then formulas, then automations. </format>

Produces a complete B2B sales CRM base spec with linked tables, rollups, views, and automations, ready to build in Airtable.

๐Ÿ’ก

Pro tip: Paste your exact pipeline stages so Claude wires the Kanban view and the weighted-value formula to your real funnel.

Freelancer & Agency Client CRM

2/30

You are an operations consultant who builds Airtable client-management bases for service businesses. <context> I need a ready-to-build Airtable base spec that tracks clients, projects, and invoices in one place, self-contained so I can recreate it quickly. </context> <inputs> - Service I provide: [ONE LINE] - Client lifecycle stages: [E.G. PROSPECT, ACTIVE, PAUSED, PAST] - How I bill: [HOURLY / RETAINER / FIXED PROJECT] - What I track per client: [E.G. RATE, RENEWAL DATE, POINT OF CONTACT] - Reports I need: [E.G. REVENUE PER CLIENT, OVERDUE INVOICES] </inputs> <task> Design tables: Clients, Projects, Invoices, Contacts. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, currency, date, percent, linked record naming the target table, lookup, rollup, formula, checkbox, attachment). Link Projects and Invoices to Clients and Contacts to Clients. Add a formula for invoice status (Draft/Sent/Paid/Overdue based on due date and paid checkbox), a rollup of total billed and total outstanding per client, and a lookup of the client name onto Invoices. Specify views: Clients grouped by lifecycle stage, Invoices grid filtered to Overdue, a calendar of invoice due dates, and a Projects Kanban by status. Then 3 automations. </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals in formulas. - Each linked field names its target table; one clear primary field per table. - No filler fields; make the flat columns importable from CSV. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. Close with the build order. </format>

Generates a freelancer or agency client CRM base spec with invoices, rollups, and overdue tracking, ready to build.

๐Ÿ’ก

Pro tip: Tell Claude your billing model up front; it changes whether the Invoices table needs hours, retainer amounts, or fixed fees.

Real Estate Lead & Deal CRM

3/30

You are a real-estate systems specialist who designs Airtable bases for agents and brokerages. <context> I need a complete Airtable base spec that manages leads, listings, and deals from first contact to close, self-contained and ready to build. </context> <inputs> - Market and property type: [E.G. RESIDENTIAL RESALE, LUXURY, RENTALS] - Lead sources: [E.G. ZILLOW, REFERRAL, OPEN HOUSE, WEBSITE] - Deal stages: [E.G. NEW, NURTURE, SHOWING, OFFER, UNDER CONTRACT, CLOSED] - Commission model: [PERCENT OR FLAT] - Reports I need: [E.G. LEADS BY SOURCE, PROJECTED COMMISSION] </inputs> <task> Design tables: Leads, Listings, Deals, Showings. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, currency, date, number, linked record naming the target table, lookup, rollup, formula, phone, email). Link Deals to Leads and Listings, and Showings to Listings and Leads. Add a formula for projected commission from price and rate, a formula for days-since-last-contact, and a rollup counting showings per listing. Specify views: Leads grouped by source, a Deals Kanban by stage, a calendar of upcoming showings, and a listings gallery. Then 3 automations (e.g. flag stale leads, notify on stage change). </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Every field spelled out; keep flat fields CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a real-estate lead and deal CRM base spec with showings, projected commission, and stale-lead flags, ready to build.

๐Ÿ’ก

Pro tip: Give Claude your commission percentage so the projected-commission formula computes real numbers instead of a placeholder.

Founder Fundraising & Investor CRM

4/30

You are a startup operator who builds Airtable bases for managing fundraising rounds. <context> I am raising a round and need a ready-to-build Airtable base spec to track investors, conversations, and commitments, self-contained so I can recreate it fast. </context> <inputs> - Round and target: [E.G. PRE-SEED, 750K] - Investor stages: [E.G. RESEARCH, INTRO, PITCHED, DILIGENCE, COMMITTED, PASSED] - Investor types I track: [E.G. ANGEL, VC, SYNDICATE] - What I log per touch: [E.G. DATE, CHANNEL, NEXT STEP] - Reports I need: [E.G. COMMITTED VS TARGET, PIPELINE BY STAGE] </inputs> <task> Design tables: Investors, Conversations, Commitments, Intros. Give each table's primary field and every field with its exact Airtable type (single/multiple select with options, currency, date, linked record naming the target table, lookup, rollup, formula, percent, checkbox, URL). Link Conversations and Commitments to Investors and Intros to Investors. Add a formula for days-since-last-touch, a rollup of total committed amount, and a formula for percent-of-target-raised. Specify views: Investors Kanban by stage, a grid of committed investors sorted by amount, a calendar of scheduled conversations, and a grid filtered to warm intros needed. Then 3 automations. </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the target table; each table has one primary field. - No vague fields; flat columns must be CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Produces a founder fundraising CRM base spec tracking investors, commitments, and percent-of-target-raised, ready to build.

๐Ÿ’ก

Pro tip: Enter your round target so the percent-raised rollup and progress view give you a live thermometer on the round.

Customer Success & Account Health CRM

5/30

You are a customer success operations lead who designs Airtable bases for retention teams. <context> I need a complete Airtable base spec to manage accounts, health, and renewals, self-contained and ready to rebuild in Airtable. </context> <inputs> - What we sell and the contract type: [E.G. ANNUAL SAAS] - Health signals I track: [E.G. USAGE, NPS, OPEN TICKETS, LAST QBR] - Account tiers: [E.G. ENTERPRISE, MID, SMB] - Renewal risk levels: [E.G. GREEN, YELLOW, RED] - Reports I need: [E.G. ARR AT RISK, RENEWALS THIS QUARTER] </inputs> <task> Design tables: Accounts, Contacts, Health Check-ins, Renewals. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, currency, date, number, rating, linked record naming the target table, lookup, rollup, formula, checkbox). Link Contacts, Check-ins, and Renewals to Accounts. Add a formula that computes a health score from usage, NPS, and open tickets, a formula that maps that score to Green/Yellow/Red, and a rollup of ARR at risk. Specify views: Accounts grouped by risk level, a calendar of upcoming renewals, a grid filtered to Red accounts, and check-ins sorted by date. Then 3 automations (e.g. alert on risk change, create a renewal task 90 days out). </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a customer success base spec with an account health score, risk levels, and renewal tracking, ready to build.

๐Ÿ’ก

Pro tip: List the exact signals you can measure so Claude weights the health-score formula around data you actually have.

XML tags are just the start. Learn the full Claude workflow.

A growing library of 300+ hands-on AI tutorials covering Claude, ChatGPT, and 50+ tools. New tutorials added every week.

Start 7-Day Free Trial

Content & Editorial Bases

5 prompts

Editorial Content Calendar

6/30

You are a content operations manager who designs Airtable editorial calendars. <context> I need a ready-to-build Airtable base spec for an editorial content calendar that runs across channels, self-contained so I can recreate it in Airtable quickly. </context> <inputs> - Channels I publish to: [E.G. BLOG, NEWSLETTER, LINKEDIN, YOUTUBE] - Content stages: [E.G. IDEA, DRAFTING, REVIEW, SCHEDULED, PUBLISHED] - Who is on the team: [WRITER, EDITOR, DESIGNER ROLES] - What I plan against: [E.G. THEMES, CAMPAIGNS, PILLARS] - Reports I need: [E.G. THIS WEEK'S QUEUE, POSTS PER CHANNEL] </inputs> <task> Design tables: Content, Channels, Campaigns, Team. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, long text, linked record naming the target table, lookup, rollup, formula, checkbox, attachment, user, URL). Link Content to Channels, Campaigns, and Team (author, editor). Add a formula for days-until-publish, a formula flagging overdue drafts, and a rollup counting pieces per campaign. Specify views: a Calendar by publish date, a Kanban by stage, a grid grouped by channel, and a view filtered to items due this week. Then 3 automations (e.g. move to Review on draft-complete, Slack the editor). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the target table; one primary field per table. - No vague fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Generates a multi-channel editorial content calendar base spec with campaigns, stages, and a publish calendar, ready to build.

๐Ÿ’ก

Pro tip: List every channel you actually publish to so the channel links and per-channel views map to your real workflow.

Blog & SEO Content Pipeline

7/30

You are an SEO content strategist who designs Airtable pipelines for organic growth teams. <context> I need a complete Airtable base spec that manages a blog and SEO content pipeline from keyword to published post, self-contained and ready to build. </context> <inputs> - Primary goal: [E.G. RANK FOR BOTTOM-FUNNEL KEYWORDS] - Content types: [E.G. GUIDE, COMPARISON, LISTICLE, GLOSSARY] - Stages: [E.G. BACKLOG, BRIEFED, WRITING, EDITING, PUBLISHED, UPDATING] - SEO fields I track: [E.G. KEYWORD, VOLUME, DIFFICULTY, TARGET URL] - Reports I need: [E.G. PIPELINE BY STAGE, POSTS DUE FOR REFRESH] </inputs> <task> Design tables: Articles, Keywords, Briefs, Authors. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, number, date, long text, URL, linked record naming the target table, lookup, rollup, formula, checkbox). Link Articles to Keywords, Briefs, and Authors. Add a formula for a priority score from volume and difficulty, a formula flagging posts older than a set refresh window, and a rollup of total target volume per author. Specify views: a Kanban by stage, a grid sorted by priority score, a calendar of publish dates, and a view filtered to posts due for a refresh. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Every field spelled out; flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a blog and SEO content pipeline base spec with a priority score, refresh flags, and keyword links, ready to build.

๐Ÿ’ก

Pro tip: Tell Claude how you weight volume vs difficulty so the priority-score formula ranks your backlog the way you actually prioritize.

Social Media Content Planner

8/30

You are a social media manager who designs Airtable planners for multi-platform posting. <context> I need a ready-to-build Airtable base spec to plan, produce, and schedule social posts across platforms, self-contained so I can recreate it quickly. </context> <inputs> - Platforms: [E.G. INSTAGRAM, TIKTOK, LINKEDIN, X] - Post formats: [E.G. REEL, CAROUSEL, STATIC, THREAD] - Content pillars: [E.G. EDUCATE, PROMOTE, BEHIND-THE-SCENES] - Approval stages: [E.G. IDEA, COPY, DESIGN, APPROVED, POSTED] - Reports I need: [E.G. POSTS PER PLATFORM PER WEEK, PILLAR MIX] </inputs> <task> Design tables: Posts, Platforms, Pillars, Assets. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, long text, attachment, linked record naming the target table, lookup, rollup, formula, checkbox, URL). Link Posts to Platforms, Pillars, and Assets. Add a formula for a character-count check on the caption, a formula for days-until-scheduled, and a rollup counting posts per pillar. Specify views: a Calendar by scheduled date, a Kanban by approval stage, a gallery of ready assets, and a grid grouped by platform. Then 3 automations (e.g. remind designer when copy is approved). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the target table; one primary field per table. - No filler fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. Close with the build order. </format>

Produces a multi-platform social media planner base spec with pillars, assets, a content calendar, and caption checks, ready to build.

๐Ÿ’ก

Pro tip: Ask Claude to set per-platform caption limits so the character-count formula warns you before a post gets truncated.

YouTube & Video Production Tracker

9/30

You are a video production manager who designs Airtable bases for YouTube channels. <context> I need a complete Airtable base spec to run a video pipeline from idea through publish and performance review, self-contained and ready to build. </context> <inputs> - Channel focus: [ONE LINE] - Video types: [E.G. TUTORIAL, VLOG, INTERVIEW, SHORT] - Production stages: [E.G. IDEA, SCRIPT, FILM, EDIT, THUMBNAIL, PUBLISHED] - Crew roles: [E.G. HOST, EDITOR, THUMBNAIL DESIGNER] - Reports I need: [E.G. UPLOAD SCHEDULE, VIDEOS STUCK IN EDIT] </inputs> <task> Design tables: Videos, Scripts, Crew, Performance. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, long text, number, duration, URL, attachment, linked record naming the target table, lookup, rollup, formula, checkbox). Link Videos to Scripts, Crew, and Performance. Add a formula for days-in-current-stage, a formula for a click-through-rate from views and impressions on the Performance table, and a rollup of total views per crew member. Specify views: a Kanban by production stage, a calendar of upload dates, a grid filtered to videos stuck in Edit over a threshold, and a gallery of published videos. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a YouTube video production base spec with a pipeline, crew links, upload calendar, and CTR formula, ready to build.

๐Ÿ’ก

Pro tip: Add a Performance table linked to Videos so Claude can compute CTR and views-per-editor once real numbers land.

Newsletter Production Base

10/30

You are a newsletter operations lead who designs Airtable bases for recurring email publishing. <context> I need a ready-to-build Airtable base spec that plans issues, tracks segments, and manages sponsors, self-contained so I can recreate it fast. </context> <inputs> - Newsletter and cadence: [E.G. WEEKLY DEV DIGEST] - Issue sections: [E.G. INTRO, MAIN STORY, LINKS, SPONSOR] - Production stages: [E.G. OUTLINE, DRAFT, REVIEW, SCHEDULED, SENT] - What I track per issue: [E.G. SEND DATE, SUBJECT, OPEN RATE, SPONSOR] - Reports I need: [E.G. UPCOMING ISSUES, SPONSOR REVENUE] </inputs> <task> Design tables: Issues, Sections, Sponsors, Story Ideas. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, long text, currency, percent, number, linked record naming the target table, lookup, rollup, formula, checkbox, URL). Link Sections and Sponsors to Issues, and Story Ideas to Issues. Add a formula for days-until-send, a formula flagging issues missing a subject line, and a rollup of total sponsor revenue per month. Specify views: a Calendar by send date, a Kanban by production stage, a grid of unassigned story ideas, and a grid grouped by sponsor. Then 3 automations (e.g. lock the issue on Scheduled, log open rate after send). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the target table; one primary field per table. - No vague fields; flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Generates a newsletter production base spec with issues, sponsors, story ideas, and revenue rollups, ready to build.

๐Ÿ’ก

Pro tip: Give Claude your section structure so each issue auto-links the right sections instead of you rebuilding them every week.

Inventory & Stock Bases

5 prompts

Ecommerce Product Inventory

11/30

You are an inventory systems designer who builds Airtable stock bases for ecommerce brands. <context> I need a complete, ready-to-build Airtable base spec to track products, variants, and stock levels, self-contained so I can recreate it in Airtable. </context> <inputs> - What I sell: [PRODUCT CATEGORY] - Variant dimensions: [E.G. SIZE, COLOR] - Suppliers I order from: [NAMES OR TYPES] - Reorder rule: [E.G. REORDER WHEN STOCK BELOW A THRESHOLD] - Reports I need: [E.G. LOW-STOCK LIST, INVENTORY VALUE] </inputs> <task> Design tables: Products, Variants, Suppliers, Purchase Orders. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, number, currency, linked record naming the target table, lookup, rollup, formula, checkbox, attachment, barcode). Link Variants to Products and Suppliers, and Purchase Orders to Suppliers and Variants. Add a formula for inventory value (stock times unit cost), a formula that flags variants at or below their reorder point, and a rollup of total units on hand per product. Specify views: a grid filtered to low-stock variants, a gallery of products, a grid grouped by supplier, and an open purchase-orders view. Then 3 automations (e.g. flag reorder, notify on PO received). </task> <constraints> - Use only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name the exact target table; each table has one primary field. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds an ecommerce inventory base spec with products, variants, reorder flags, and inventory value, ready to build.

๐Ÿ’ก

Pro tip: Set your reorder threshold in the inputs so the low-stock formula and view surface exactly what needs ordering.

Multi-Location Warehouse Stock

12/30

You are a supply-chain analyst who designs Airtable bases for warehouse operations. <context> I need a ready-to-build Airtable base spec that tracks stock across multiple locations and logs movements between them, self-contained and ready to rebuild. </context> <inputs> - Locations: [E.G. WAREHOUSE A, WAREHOUSE B, STORE] - Item types: [E.G. SKUS, PALLETS] - Movement types: [E.G. INBOUND, TRANSFER, OUTBOUND, ADJUSTMENT] - What I track per item: [E.G. SKU, UNIT COST, BIN] - Reports I need: [E.G. STOCK BY LOCATION, RECENT MOVEMENTS] </inputs> <task> Design tables: Items, Locations, Stock Levels, Movements. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, number, currency, date, linked record naming the target table, lookup, rollup, formula, checkbox, barcode). Stock Levels links to both Items and Locations (one row per item-location). Movements links to Items, a from-Location, and a to-Location. Add a formula for line value (quantity times unit cost), a formula labeling each movement direction, and a rollup of total quantity per item across locations. Specify views: a grid grouped by location, a grid filtered to below-safety-stock, a calendar of movements, and a grid grouped by movement type. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - No filler fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. Close with the build order. </format>

Produces a multi-location warehouse stock base spec with per-location levels, movements, and value rollups, ready to build.

๐Ÿ’ก

Pro tip: Model stock as one row per item-location in the Stock Levels table so rollups sum cleanly across every warehouse.

Restaurant & Kitchen Ingredient Inventory

13/30

You are a restaurant operations consultant who designs Airtable bases for kitchen inventory. <context> I need a complete Airtable base spec to track ingredients, suppliers, and recipe costs, self-contained so I can recreate it quickly. </context> <inputs> - Cuisine and menu size: [ONE LINE] - Ingredient units: [E.G. KG, LITERS, EACH] - Suppliers: [NAMES OR TYPES] - What I track per ingredient: [E.G. UNIT COST, PAR LEVEL, EXPIRY] - Reports I need: [E.G. BELOW PAR, RECIPE COST, WASTE] </inputs> <task> Design tables: Ingredients, Suppliers, Recipes, Recipe Lines. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, number, currency, date, linked record naming the target table, lookup, rollup, formula, checkbox). Recipe Lines links a Recipe to an Ingredient with a quantity. Add a formula for line cost (quantity times ingredient unit cost via lookup), a rollup summing line costs into a total recipe cost, a formula flagging ingredients below par level, and a formula flagging items expiring within a set window. Specify views: a grid filtered to below-par ingredients, a grid grouped by supplier, a recipes gallery with total cost, and an expiring-soon view. Then 3 automations. </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a kitchen inventory base spec with ingredients, par levels, expiry flags, and recipe costing, ready to build.

๐Ÿ’ก

Pro tip: Use a Recipe Lines join table so Claude can roll ingredient costs up into an accurate per-recipe cost.

Asset & Equipment Tracking

14/30

You are an IT and facilities operations lead who designs Airtable bases for asset management. <context> I need a ready-to-build Airtable base spec to track physical assets, who holds them, and maintenance, self-contained and ready to rebuild. </context> <inputs> - Asset types: [E.G. LAPTOPS, TOOLS, VEHICLES] - Who assets are assigned to: [E.G. EMPLOYEES, DEPARTMENTS] - Statuses: [E.G. IN USE, AVAILABLE, REPAIR, RETIRED] - What I track: [E.G. SERIAL, PURCHASE DATE, WARRANTY END, VALUE] - Reports I need: [E.G. ASSETS PER PERSON, WARRANTIES EXPIRING] </inputs> <task> Design tables: Assets, People, Assignments, Maintenance. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, currency, number, linked record naming the target table, lookup, rollup, formula, checkbox, attachment, barcode). Assignments links an Asset to a Person with checkout and return dates; Maintenance links to Assets. Add a formula for current age of the asset in years, a formula flagging warranties expiring within a set window, and a rollup of total asset value per person. Specify views: a grid grouped by status, a grid filtered to assets currently checked out, a calendar of scheduled maintenance, and a warranties-expiring view. Then 3 automations (e.g. notify on overdue return). </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - No vague fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Generates an asset and equipment tracking base spec with assignments, maintenance, and warranty-expiry flags, ready to build.

๐Ÿ’ก

Pro tip: Track assignments in their own table so an asset's full checkout history stays intact instead of overwriting one holder field.

Manufacturing Bill-of-Materials & Raw Stock

15/30

You are a manufacturing operations engineer who designs Airtable bases for production planning. <context> I need a complete Airtable base spec that ties finished products to their bill of materials and raw-material stock, self-contained and ready to build. </context> <inputs> - What we manufacture: [PRODUCT LINE] - Raw material types: [E.G. METALS, COMPONENTS, PACKAGING] - Units: [E.G. KG, METERS, EACH] - Suppliers and lead times: [NAMES, DAYS] - Reports I need: [E.G. CAN-WE-BUILD CHECK, MATERIALS TO REORDER] </inputs> <task> Design tables: Products, Materials, BOM Lines, Suppliers. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, number, currency, linked record naming the target table, lookup, rollup, formula, checkbox). BOM Lines links a Product to a Material with a required quantity per unit. Add a formula for the material cost of each BOM line (quantity times material unit cost via lookup), a rollup summing BOM line costs into a total product build cost, a formula flagging materials below their reorder point, and a formula for reorder-by date from lead time. Specify views: a grid grouped by product showing its BOM, a materials grid filtered to reorder-needed, a grid grouped by supplier, and a products gallery with build cost. Then 3 automations. </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a manufacturing BOM and raw-stock base spec with per-line costing, build cost rollups, and reorder flags, ready to build.

๐Ÿ’ก

Pro tip: Give suppliers a lead-time field so Claude can compute reorder-by dates instead of just flagging what is already low.

Project Management Bases

5 prompts

Agile Sprint & Software Project

16/30

You are an engineering program manager who designs Airtable bases for agile teams. <context> I need a ready-to-build Airtable base spec to run sprints, tasks, and bugs for a software team, self-contained so I can recreate it in Airtable. </context> <inputs> - Team and product: [ONE LINE] - Task statuses: [E.G. BACKLOG, TODO, IN PROGRESS, REVIEW, DONE] - Sprint length: [E.G. 2 WEEKS] - What I track per task: [E.G. STORY POINTS, PRIORITY, ASSIGNEE, EPIC] - Reports I need: [E.G. SPRINT BURNDOWN INPUTS, WORKLOAD PER PERSON] </inputs> <task> Design tables: Tasks, Sprints, Epics, Team. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, number, date, long text, linked record naming the target table, lookup, rollup, formula, checkbox, user). Link Tasks to Sprints, Epics, and Team (assignee). Add a formula for whether a task is blocked or overdue, a rollup of total story points per sprint, and a rollup of open points per assignee. Specify views: a Kanban by status, a grid grouped by sprint, a grid grouped by assignee, and a view filtered to the current sprint. Then 3 automations (e.g. set Done date when status is Done, notify assignee on assignment). </task> <constraints> - Use only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name the exact target table; each table has one primary field. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Produces an agile sprint base spec with tasks, epics, story-point rollups, and per-assignee workload, ready to build.

๐Ÿ’ก

Pro tip: Ask Claude for a rollup of open points per assignee so the workload view flags who is overloaded mid-sprint.

Client Project & Deliverables

17/30

You are an agency delivery lead who designs Airtable bases for managing client projects. <context> I need a complete Airtable base spec that tracks client projects, deliverables, and time, self-contained and ready to rebuild in Airtable. </context> <inputs> - Types of projects we deliver: [E.G. BRANDING, WEB BUILD, CAMPAIGN] - Project phases: [E.G. KICKOFF, DISCOVERY, BUILD, REVIEW, LAUNCH] - How we bill: [HOURLY / FIXED] - What I track per deliverable: [E.G. OWNER, DUE DATE, STATUS, HOURS] - Reports I need: [E.G. OVERDUE DELIVERABLES, HOURS VS BUDGET] </inputs> <task> Design tables: Projects, Deliverables, Time Entries, Clients. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, number, currency, linked record naming the target table, lookup, rollup, formula, checkbox, user). Link Deliverables and Time Entries to Projects, and Projects to Clients. Add a formula flagging overdue deliverables, a rollup of logged hours per project, and a formula for percent-of-budget-used from logged hours and the budget. Specify views: a Kanban of deliverables by status, a calendar of due dates, a grid grouped by project, and a view filtered to over-budget projects. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - No filler fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. Close with the build order. </format>

Builds a client project base spec with deliverables, time entries, and percent-of-budget tracking, ready to build.

๐Ÿ’ก

Pro tip: Log time in its own table so Claude can roll hours up per project and compare them against your budget automatically.

Product Roadmap

18/30

You are a product operations lead who designs Airtable bases for roadmapping. <context> I need a ready-to-build Airtable base spec to prioritize features and plan a roadmap by quarter, self-contained so I can recreate it fast. </context> <inputs> - Product: [ONE LINE] - Prioritization framework: [E.G. RICE, VALUE VS EFFORT] - Statuses: [E.G. IDEA, PLANNED, BUILDING, SHIPPED] - Timeframes: [E.G. QUARTERS OR MONTHS] - Reports I need: [E.G. ROADMAP BY QUARTER, TOP-SCORED FEATURES] </inputs> <task> Design tables: Features, Themes, Releases, Feedback. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, number, date, long text, linked record naming the target table, lookup, rollup, formula, checkbox, user). Link Features to Themes and Releases, and Feedback to Features. Add a formula for a RICE or value/effort score from the input fields, a rollup counting linked feedback per feature, and a formula for target quarter from the planned date. Specify views: a grid sorted by score, a Kanban by status, a timeline or calendar grouped by release, and a view grouped by theme. Then 3 automations (e.g. move to Shipped and set ship date on release). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Generates a product roadmap base spec with a prioritization score, themes, releases, and linked feedback, ready to build.

๐Ÿ’ก

Pro tip: Tell Claude which framework you use so the score formula matches RICE, value/effort, or your own weighting exactly.

Marketing Campaign Project

19/30

You are a marketing operations manager who designs Airtable bases for campaign execution. <context> I need a complete Airtable base spec to plan campaigns, their tasks, and channel budgets, self-contained and ready to build. </context> <inputs> - Campaign types: [E.G. PRODUCT LAUNCH, WEBINAR, SEASONAL PROMO] - Channels: [E.G. EMAIL, PAID, SOCIAL, EVENTS] - Task stages: [E.G. PLANNED, IN PROGRESS, BLOCKED, DONE] - What I track per campaign: [E.G. GOAL, BUDGET, START, END, OWNER] - Reports I need: [E.G. SPEND VS BUDGET, TASKS DUE THIS WEEK] </inputs> <task> Design tables: Campaigns, Tasks, Channels, Assets. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, currency, number, linked record naming the target table, lookup, rollup, formula, checkbox, user, URL). Link Tasks and Assets to Campaigns, and Campaigns to Channels. Add a formula flagging tasks due this week, a rollup of total planned spend per campaign, and a formula for percent-of-budget-spent. Specify views: a Kanban of tasks by stage, a calendar of campaign start and end dates, a grid grouped by channel, and a view filtered to over-budget campaigns. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - No vague fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Builds a marketing campaign base spec with tasks, channel budgets, and spend-vs-budget tracking, ready to build.

๐Ÿ’ก

Pro tip: Give each campaign a budget field so Claude's percent-spent formula turns your task costs into a live burn rate.

Cross-Team Initiatives & OKRs

20/30

You are a strategy operations lead who designs Airtable bases for company-wide planning. <context> I need a ready-to-build Airtable base spec that connects objectives, key results, and the initiatives that drive them across teams, self-contained and ready to rebuild. </context> <inputs> - Teams: [E.G. PRODUCT, MARKETING, SALES] - OKR cycle: [E.G. QUARTERLY] - Key result types: [E.G. METRIC TARGET, MILESTONE] - What I track per initiative: [E.G. OWNER, STATUS, DUE DATE] - Reports I need: [E.G. OKR PROGRESS, INITIATIVES AT RISK] </inputs> <task> Design tables: Objectives, Key Results, Initiatives, Teams. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, number, percent, date, linked record naming the target table, lookup, rollup, formula, checkbox, user). Link Key Results to Objectives, Initiatives to Key Results and Teams. Add a formula for key-result progress percent from current and target values, a rollup averaging key-result progress into objective progress, and a formula flagging initiatives that are off-track (past due and not done). Specify views: a grid grouped by team, a grid grouped by objective showing progress, a calendar of initiative due dates, and a view filtered to at-risk initiatives. Then 3 automations. </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Produces a cross-team OKR base spec linking objectives, key results, and initiatives with progress rollups, ready to build.

๐Ÿ’ก

Pro tip: Store current and target values on each key result so Claude computes progress and rolls it up into objective completion.

Event Planning Bases

5 prompts

Conference & Multi-Session Event

21/30

You are an event operations producer who designs Airtable bases for conferences. <context> I need a complete, ready-to-build Airtable base spec to run a multi-track conference: sessions, speakers, rooms, and attendees, self-contained so I can recreate it in Airtable. </context> <inputs> - Event name, dates, venue: [DETAILS] - Number of tracks and rooms: [NUMBERS] - Session types: [E.G. KEYNOTE, TALK, WORKSHOP, PANEL] - Ticket tiers: [E.G. GENERAL, VIP, SPEAKER] - Reports I need: [E.G. SCHEDULE BY ROOM, SPEAKER CONFIRMATIONS] </inputs> <task> Design tables: Sessions, Speakers, Rooms, Attendees. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, duration, number, linked record naming the target table, lookup, rollup, formula, checkbox, email, attachment). Link Sessions to Speakers and Rooms, and Attendees to a ticket tier. Add a formula for session end time from start and duration, a formula flagging room double-bookings on overlapping times, and a rollup counting sessions per speaker. Specify views: a calendar of sessions by time, a grid grouped by room, a grid filtered to unconfirmed speakers, and an attendees grid grouped by ticket tier. Then 3 automations (e.g. email speakers on confirmation). </task> <constraints> - Use only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name the exact target table; each table has one primary field. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a conference base spec with sessions, speakers, rooms, a schedule calendar, and double-booking checks, ready to build.

๐Ÿ’ก

Pro tip: Ask Claude for a formula that flags overlapping sessions in the same room so clashes surface before you publish the agenda.

Wedding Planning

22/30

You are a wedding planner who designs Airtable bases to run events end to end. <context> I need a ready-to-build Airtable base spec to plan a wedding: guests, vendors, budget, and timeline, self-contained so I can recreate it quickly. </context> <inputs> - Date and venue: [DETAILS] - Guest count and groups: [E.G. FAMILY, FRIENDS, WORK] - Vendor categories: [E.G. CATERING, PHOTO, MUSIC, FLORALS] - Total budget: [AMOUNT] - Reports I need: [E.G. RSVP TOTALS, BUDGET REMAINING, PAYMENTS DUE] </inputs> <task> Design tables: Guests, Vendors, Budget Items, Timeline. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, currency, number, linked record naming the target table, lookup, rollup, formula, checkbox, email, phone). Link Budget Items to Vendors, and Guests to a group and a table assignment. Add a formula for balance due per vendor (cost minus paid), a rollup of total committed spend, a formula for budget remaining against the total, and a rollup counting confirmed RSVPs. Specify views: a grid grouped by RSVP status, a grid grouped by vendor category, a calendar of the day-of timeline, and a payments-due view. Then 3 automations (e.g. remind on upcoming vendor payment). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - No filler fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. Close with the build order. </format>

Generates a wedding planning base spec with guests, vendors, budget balance, and a day-of timeline, ready to build.

๐Ÿ’ก

Pro tip: Enter your total budget so Claude's remaining-budget formula updates every time you add a vendor cost.

Webinar & Virtual Event

23/30

You are a demand-generation lead who designs Airtable bases for virtual events. <context> I need a complete Airtable base spec to run a webinar program: sessions, registrants, promotion tasks, and follow-up, self-contained and ready to build. </context> <inputs> - Webinar topic and format: [E.G. LIVE DEMO, PANEL] - Registration source fields: [E.G. UTM, COMPANY, ROLE] - Promotion channels: [E.G. EMAIL, PAID, PARTNERS] - What I track post-event: [E.G. ATTENDED, WATCHED REPLAY, MQL] - Reports I need: [E.G. REGISTRATION VS ATTENDANCE, LEADS BY SOURCE] </inputs> <task> Design tables: Webinars, Registrants, Promo Tasks, Follow-ups. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, number, percent, linked record naming the target table, lookup, rollup, formula, checkbox, email, URL). Link Registrants, Promo Tasks, and Follow-ups to Webinars. Add a formula for attendance rate per webinar (attended divided by registered), a formula labeling each registrant's engagement (No-show / Attended / Watched Replay), and a rollup counting registrants per source. Specify views: a grid grouped by webinar, a Kanban of promo tasks by status, a grid filtered to no-shows needing follow-up, and a grid grouped by lead source. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds a webinar base spec with registrants, promo tasks, attendance-rate formulas, and follow-up tracking, ready to build.

๐Ÿ’ก

Pro tip: Track attended and registered as numbers so Claude can compute attendance rate and split no-shows into a follow-up view.

Corporate Offsite & Retreat

24/30

You are a workplace experience manager who designs Airtable bases for team offsites. <context> I need a ready-to-build Airtable base spec to plan a company offsite: attendees, travel, agenda, and budget, self-contained so I can recreate it fast. </context> <inputs> - Offsite dates and location: [DETAILS] - Number of attendees and teams: [NUMBERS] - Logistics tracked: [E.G. FLIGHTS, HOTEL, DIETARY, T-SHIRT SIZE] - Agenda blocks: [E.G. SESSIONS, MEALS, ACTIVITIES] - Reports I need: [E.G. TRAVEL STATUS, COST PER HEAD, AGENDA] </inputs> <task> Design tables: Attendees, Agenda, Logistics, Budget. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, time, currency, number, linked record naming the target table, lookup, rollup, formula, checkbox, email). Link Logistics and Budget items to Attendees or Agenda blocks. Add a formula flagging attendees missing travel details, a rollup of total cost, a formula for cost per head against the attendee count, and a formula for agenda-block end time from start and duration. Specify views: a grid grouped by team, a calendar of the agenda, a grid filtered to incomplete travel, and a budget grid grouped by category. Then 3 automations (e.g. remind attendees to submit travel). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the exact target table; one primary field per table. - No vague fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Produces a corporate offsite base spec with attendees, travel logistics, agenda, and cost-per-head, ready to build.

๐Ÿ’ก

Pro tip: Ask Claude for a formula that flags attendees missing flight or hotel info so nobody slips through before the deadline.

Event Vendor & Budget Manager

25/30

You are an event budget manager who designs Airtable bases to control event spend and vendors. <context> I need a complete Airtable base spec focused on managing vendors, contracts, payments, and budget for any event, self-contained and ready to build. </context> <inputs> - Event type and scale: [ONE LINE] - Vendor categories: [E.G. VENUE, CATERING, AV, DECOR, SECURITY] - Total budget: [AMOUNT] - Payment structure: [E.G. DEPOSIT PLUS BALANCE] - Reports I need: [E.G. SPEND BY CATEGORY, PAYMENTS DUE, VARIANCE] </inputs> <task> Design tables: Vendors, Contracts, Payments, Budget Categories. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, currency, date, percent, linked record naming the target table, lookup, rollup, formula, checkbox, attachment). Link Contracts and Payments to Vendors, and Vendors to a Budget Category. Add a formula for balance owed per vendor (contract total minus payments), a rollup of actual spend per category, a formula for variance against the category budget, and a formula flagging payments due within a set window. Specify views: a grid grouped by category showing budget vs actual, a calendar of payment due dates, a grid filtered to unsigned contracts, and a payments-due view. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Builds an event vendor and budget base spec with contracts, payments, category variance, and due-date flags, ready to build.

๐Ÿ’ก

Pro tip: Give each budget category a planned amount so Claude's variance formula shows exactly where the event is over or under.

Most people use 10% of Claude. Tutorials unlock the rest.

AI Academy: 300+ hands-on tutorials on Claude, ChatGPT, Midjourney, and 50+ AI tools. New tutorials added every week.

Start Your Free Trial

Applicant Tracker Bases

5 prompts

Recruiting ATS Pipeline

26/30

You are a talent operations lead who designs Airtable applicant tracking systems. <context> I need a complete, ready-to-build Airtable base spec for an ATS that moves candidates through a hiring pipeline, self-contained so I can recreate it in Airtable. </context> <inputs> - Roles we hire for: [E.G. ENGINEERING, SALES, OPS] - Pipeline stages: [E.G. APPLIED, SCREEN, INTERVIEW, OFFER, HIRED, REJECTED] - Sources: [E.G. LINKEDIN, REFERRAL, JOB BOARD] - What I track per candidate: [E.G. RESUME, RATING, RECRUITER] - Reports I need: [E.G. PIPELINE BY STAGE, TIME-TO-HIRE, SOURCE MIX] </inputs> <task> Design tables: Candidates, Openings, Interviews, Recruiters. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, rating, long text, linked record naming the target table, lookup, rollup, formula, checkbox, email, phone, attachment). Link Candidates to Openings and Recruiters, and Interviews to Candidates. Add a formula for days-in-stage, a formula for time-to-hire (hired date minus applied date), and a rollup counting active candidates per opening. Specify views: a Kanban by stage, a grid grouped by opening, a grid grouped by source, and a view filtered to candidates stalled beyond a threshold. Then 3 automations (e.g. email on stage change, flag stale candidates). </task> <constraints> - Use only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name the exact target table; each table has one primary field. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Produces a recruiting ATS base spec with a candidate pipeline, interviews, time-to-hire, and stalled-candidate flags, ready to build.

๐Ÿ’ก

Pro tip: Store applied and hired dates so Claude can compute time-to-hire and expose bottleneck stages in your funnel.

Job Openings & Requisitions

27/30

You are an HR operations manager who designs Airtable bases to manage open requisitions. <context> I need a ready-to-build Airtable base spec that tracks job requisitions, approvals, and hiring targets, self-contained and ready to rebuild. </context> <inputs> - Departments hiring: [E.G. ENGINEERING, MARKETING] - Requisition statuses: [E.G. DRAFT, APPROVED, OPEN, ON HOLD, FILLED] - What I track per req: [E.G. TITLE, HIRING MANAGER, SALARY BAND, TARGET START] - Approval steps: [E.G. FINANCE, HEAD OF DEPT] - Reports I need: [E.G. OPEN REQS BY DEPT, TIME-OPEN, HEADCOUNT PLAN] </inputs> <task> Design tables: Requisitions, Departments, Hiring Managers, Approvals. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, currency, date, number, linked record naming the target table, lookup, rollup, formula, checkbox, user). Link Requisitions to Departments and Hiring Managers, and Approvals to Requisitions. Add a formula for days-open (today minus opened date, while unfilled), a formula for the salary band midpoint, and a rollup counting open reqs per department. Specify views: a grid grouped by department, a Kanban by status, a grid filtered to reqs awaiting approval, and a view sorted by days-open. Then 3 automations (e.g. notify approver, set opened date on Approved). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - No filler fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. Close with the build order. </format>

Builds a job requisition base spec with approvals, salary bands, days-open, and per-department headcount, ready to build.

๐Ÿ’ก

Pro tip: Add opened and filled dates so Claude's days-open formula flags requisitions that have been stuck too long.

Interview Scorecard & Feedback

28/30

You are a hiring operations specialist who designs Airtable bases for structured interviews. <context> I need a complete Airtable base spec that captures structured interview scorecards and aggregates feedback per candidate, self-contained and ready to build. </context> <inputs> - Roles being assessed: [E.G. PM, ENGINEER] - Competencies scored: [E.G. PROBLEM SOLVING, COMMUNICATION, CULTURE] - Rating scale: [E.G. 1 TO 4] - Interviewers and rounds: [E.G. SCREEN, TECHNICAL, FINAL] - Reports I need: [E.G. AVERAGE SCORE PER CANDIDATE, HIRE RECOMMENDATIONS] </inputs> <task> Design tables: Candidates, Scorecards, Competency Scores, Interviewers. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, rating, number, long text, linked record naming the target table, lookup, rollup, formula, checkbox, user). A Scorecard links a Candidate, an Interviewer, and a round; Competency Scores link to a Scorecard and a competency. Add a rollup averaging competency scores into a scorecard score, a rollup averaging scorecard scores per candidate, and a formula turning the average into a recommendation label (Strong Hire / Hire / No Hire). Specify views: a grid grouped by candidate, a grid grouped by interviewer, a grid filtered to incomplete scorecards, and a candidates grid sorted by average score. Then 3 automations. </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Generates an interview scorecard base spec that aggregates competency ratings into per-candidate recommendations, ready to build.

๐Ÿ’ก

Pro tip: Score each competency in its own row so Claude can roll them into a scorecard average and then a per-candidate average cleanly.

Candidate Sourcing & Talent Pool

29/30

You are a sourcing lead who designs Airtable bases to build and nurture a talent pipeline. <context> I need a ready-to-build Airtable base spec to organize sourced candidates, outreach, and a warm talent pool, self-contained so I can recreate it fast. </context> <inputs> - Roles I source for: [E.G. SENIOR ENGINEERS, DESIGNERS] - Outreach stages: [E.G. SOURCED, CONTACTED, REPLIED, IN PROCESS, PASSIVE] - Channels: [E.G. LINKEDIN, GITHUB, REFERRAL, EVENT] - What I track: [E.G. SKILLS, LOCATION, SENIORITY, LAST CONTACT] - Reports I need: [E.G. OUTREACH DUE, RESPONSE RATE, POOL BY SKILL] </inputs> <task> Design tables: Prospects, Outreach, Skills, Roles. Give each table its primary field and every field with its exact Airtable type (single/multiple select with options, date, number, percent, linked record naming the target table, lookup, rollup, formula, checkbox, URL, email). Link Prospects to Skills and Roles, and Outreach to Prospects. Add a formula for days-since-last-contact, a formula flagging prospects due for a follow-up, and a rollup of response rate per channel (replied divided by contacted). Specify views: a Kanban by outreach stage, a grid grouped by skill, a grid filtered to follow-ups due, and a grid grouped by channel. Then 3 automations (e.g. create a follow-up task after outreach). </task> <constraints> - Real Airtable field types and valid formula syntax only; single-quote string literals. - Linked fields name the exact target table; one primary field per table. - No vague fields; keep flat columns CSV-importable. </constraints> <format> Return one Markdown table per Airtable table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations. End with the build order. </format>

Builds a candidate sourcing base spec with a talent pool, outreach cadence, follow-up flags, and response rates, ready to build.

๐Ÿ’ก

Pro tip: Track contacted and replied counts per channel so Claude can compute where your outreach actually converts.

University & Internship Recruiting

30/30

You are a campus recruiting manager who designs Airtable bases for early-career hiring. <context> I need a complete Airtable base spec to manage university recruiting: schools, events, applicants, and offers, self-contained and ready to build. </context> <inputs> - Programs I recruit for: [E.G. SUMMER INTERNSHIP, NEW GRAD] - Schools targeted: [NAMES OR TIERS] - Event types: [E.G. CAREER FAIR, INFO SESSION, HACKATHON] - Applicant stages: [E.G. APPLIED, ASSESSMENT, INTERVIEW, OFFER, ACCEPTED] - Reports I need: [E.G. APPLICANTS PER SCHOOL, OFFER ACCEPTANCE RATE] </inputs> <task> Design tables: Applicants, Schools, Events, Offers. Provide each table's primary field and every field with its exact Airtable type (single/multiple select with options, date, number, percent, currency, linked record naming the target table, lookup, rollup, formula, checkbox, email, attachment). Link Applicants to Schools and Events, and Offers to Applicants. Add a formula for the applicant's current stage age in days, a rollup counting applicants per school, and a formula for offer acceptance rate per school (accepted divided by offers made). Specify views: a Kanban of applicants by stage, a grid grouped by school, a calendar of recruiting events, and a grid filtered to offers awaiting a response. Then 3 automations (e.g. remind on offer-response deadline). </task> <constraints> - Only real Airtable field types and valid formula syntax; single-quote string literals. - Linked fields name their exact target table; one primary field per table. - Spell out every field; keep flat columns CSV-importable. </constraints> <format> Return a Markdown table per table (Field | Type | Notes), then Views, a Formulas block with exact text, and Automations, then the build order. </format>

Produces a campus recruiting base spec with schools, events, applicant pipeline, and offer acceptance rates, ready to build.

๐Ÿ’ก

Pro tip: Link applicants to both schools and events so Claude can report which campus channels actually produce accepted offers.

Frequently Asked Questions

Claude returns a precise base spec: every table, field type, link, view, formula, and automation, not a live base. You recreate it in Airtable by following the build order, which usually takes under an hour. It is far faster and cleaner than designing the schema from a blank base.
Build the tables first, add fields in the listed order, then create the linked-record fields that connect the tables, paste in the formulas, and set up the automations last. Every prompt ends with this exact build order. For the flat text and number fields you can also import a CSV, then add links and formulas afterward.
The prompts constrain Claude to real Airtable field types and valid formula syntax, so lookups, rollups, and formula fields paste in cleanly. Double-check that field names in a formula match your table exactly, since Airtable references fields by name and a typo will break the formula.
Yes. Fill in the bracketed inputs with your own stages, fields, and team, and Claude tailors the schema to match. After the first version you can ask it to add a table, change a view type, adjust a formula, or add an automation, and it will update just that part of the spec.
The core schema (tables, fields, linked records, formulas, and standard grid, Kanban, calendar, and gallery views) works on the free plan. Automation runs and some advanced features have limits, so ask Claude to flag anything that needs a paid plan and suggest a lighter alternative.

Prompts are the starting line. Tutorials are the finish.

A growing library of 300+ hands-on tutorials on ChatGPT, Claude, Midjourney, and 50+ AI tools. New tutorials added every week.

7-day free trial. Cancel anytime.